Navajo-Gallup Water
Supply Project (NGWSP)
Reach 21 DZ Booster Pump Plant and Tank
Pre-Bid Conference Site Tour
November 12, 2026

Agenda
• Introduction
• NGWSP Overview
• Reach 21 DZ Booster Pump and Tank Locations and Scope • Procurement Requirements
• Travel Plan
• JHA
• Questions
• Adjourn

NGWSP Background
• Description

• Currently estimated at $2.4 Billion
• 2 Main Laterals (Cutter and San Juan) totaling 300 miles of Pipelines (20”-48”) • 2 Conventional Water Treatment Plants with ultimate capacity of 5 & 38 MGD • 19 Pumping Plants -- raw and finished water
• 13 Turnout Buildings
• Numerous Storage Tanks
• Construction began in June 2012
• Scheduled to end in December 2028

Project Overview Map

FCWR

Intake Pumping Plant

Shiprock Connection

CLWTP

Reach 1

San Juan Lateral WTP

San Juan
Lateral

Cutter
Lateral

Block 2-3

Reach 21 DZ Booster PP and Tank

Window Rock

City of Gallup

Crownpoint
Operational
Completed
Under Construction
In Design
Subject Project in Solicitation
(As of November 2026)

DZ Booster and Tank Location

Issues and Goals
• Reg Tank 3 base elevation built 15.5-ft
lower than DZ tanks

• 15.5-ft of water in Reg Tank 3 = 0-ft in DZ
Reg Tank
DZ Carson System

DZ Dist Tanks

• Temporary inline booster installed in 2020.
• Reg Tank 3 operating with minimum water
surface elevation of 20-ft
• 17-ft needed for DZ Distribution Tanks
Reg Tank 3

DZ Reg Tank

4.5’
20’

Summary of Work
• Pre-engineered concrete booster
pump station, concrete
foundation pad, pipe
encasement, yard pipe, fencing,
electrical equipment, gravel
surfacing, and pipe connections.

• Replacement of gravel surfacing at Regulation
Tank No. 3 site.

• Installation of secondary
regulation tank at Regulation
Tank No. 3 site, foundation,
electrical equipment, yard pipe,
and pipe connections.

• Supervisory Control and Data Acquisition
(SCADA) equipment.

• Erosion and scour restoration/prevention:

• Includes a retaining wall, swale, runoff channel, and site regrading.

DZ Booster PP Features
• Pumps, Piping, and Valving
• Building with Foundation
• Connection to Reach 21 pipe (supply)
• Connection to ENWP Ph 3 pipe
(delivery)
• Chain link fence with vehicle access
gates
• Electrical Power
• SCADA and Radio Communications
• Erosion control features

Reg. Tank 3 Features
• New 500,000 gal Tank
• Foundation
• Piping and Valving
• Resurfacing with gravel
• Cathodic Protection