SITE TOUR AGENDA Reach 21 Booster Site 0002
Updated
A PDF document (129 KB) attached to NGWSP Cutter Lateral Reach 21 Booster Plant, from the Bureau of Reclamation. Due Jan 25, 2027, 10:00 AM (UTC-7).
File name: SITE_TOUR_AGENDA_Reach_21_Booster_Site_0002.pdf
The full file is for paid members, or buy this bid alone.
Preview
Pre-Bid Conference/Site Tour Agenda
Solicitation No. 140RR027B0004
Navajo-Gallup Water Supply Project –Cutter Lateral Reach 21 Booster Plant San Juan County, New Mexico
November 12, 2026, 9:00 Am (MST)
1.
INTRODUCTIONS / SIGN IN
2.
PROJECT OVERVIEW AND SAFETY -- PRESENTATION
3.
ACQUISITION OVERVIEW
a. This job is considered heavy construction, alteration, or repair. b. Invitation for Bid – FAR 14
c. Bids will be opened on January 25, 2027, 10:00 am MST d. Submittal requirements -- Section 01 33 00
e. Contract Document Management System -- Section 01 31 30 f. All applicable Federal, State, and Local Taxes shall be paid by the contractor. g. Land/ROW Access: Stay on established roads and ROWs due to environmental/cultural resources in area.
4.
PRINCIPAL CONSTRUCTION COMPONENTS
a. Pre-engineered concrete booster pump station, concrete foundation pad, pipe encasement, yard pipe, fencing, electrical equipment, gravel surfacing, and pipe connections. b. Installation of secondary regulation tank at Regulation Tank No. 3 site, foundation, electrical equipment, yard pipe, and pipe connections.
c. Replacement of gravel surfacing at Regulation Tank No. 3 site. d. Erosion and scour restoration/prevention:
• Includes a retaining wall, swale, runoff channel, and site regrading. e. Supervisory Control and Data Acquisition (SCADA) equipment.
5.
ENVIRONMENTAL REQUIREMENTS: (Permitting, SWPPP, Dewatering, 404, NOI, Nationwide 12 permit).
6.
CULTURAL REQUIREMENTS: (Ground Disturbing Activities, Archeological Site Monitors See Section 01 57 90)
7.
SAFETY REQUIREMENTS -- Reclamation Safety and Health Standards (RSHS) https://www.usbr.gov/safety/rshs/index.html
8.
I.13 52.225-9 BUY AMERICAN CONSTRUCTION MATERIALS – Construction Materials under Trade Agreements.
9.
PREFACE – Please become familiar with these Specifications sections: Quality Control, Quantity Surveys, Submittals, As-Built Drawings, Environmental Compliance and Permitting, Cultural Resources Compliance and Archaeological Permitting, Taxes, and Project Specific Areas of Concern, Interest, and/or Consideration.
10.
SOLICITATION POINTS OF CONTACT AND COMMUNICATION
a. Contracting Officer (Tyler Spencer, 801-524-3653, [email protected]) and Contracting Specialist (Philoma Singer, 505-324-5033, [email protected]) are the official points of contact. b. No verbal questions will be formally taken today.
c. All questions must be submitted in writing to Contracting Officer and Contracting Specialist no later than
The beginning of the document. Download the full file to read on.