AGL - Standard Trip Report - Rev2
Date 15/10/26
Page
1. Site Information
Airport/Customer name
DFAS-LI-FP-F67100
Service Performed
LFI PMA Trip 2 - 2026
Start Date
2026-10-04
End date
2026-10-09
2. Field findings
Field observations and findings
Arrived onsite to complete the second leg of the 2026 PMA. Upon arrival, there were no alarms in the system and no issues or concerns brought up by the customer. Previous visit was in April 2026 and no major changes or issues since then. Verified each active circuit. Calibrated each CCR to customer specifications. Logged all information, in regards to amperage output, voltage, and VA. Used the information collected and compared it to that of the previous visit and there was little to no deviation. Customer reported no incidents since the last visit except for the power cord to the tower touchscreen had somehow fried on the connecting end to the tower cab touchscreen. Currently, they have a temporary solution for power to the touchscreen. A new power brick and cord has been ordered and is being shipped for replacement. Inspected and verified connectivity of all network devices associated with the ALCMS.
3. Conclusion
Conclusions and Recommendations
This concludes the 2026 PMA and there are no open items, aside from the shipment of the power brick and cord.
Attachments and pictures
Screenshot_20261015_200327_Gallery
Screenshot_20261015_200310_Gallery
Spare Parts Recommendation
4. Signatures
ADB SAFEGATE Representative
Immer Adame
Date/time title
ADB_Safegate - -
2026-10-09
- -
AGL - Standard Trip Report - Rev2
Date 15/10/26
Page
Airport/Customer representative
Joseph Gandarillas
Date/time title
ADB_Safegate - -
2026-10-09
- -