Date 24/04/26

AGL ALCMS/CCR-PMA Basic

Page

1. Customer Information

Contact Name

David Spangler

Contact Title

Electrical Maintenance Foreman

Contact Phone #

+1 757 846 6494

Contact E-Mail

[email protected]

2. Airport Information

IATA Code

LFI (Langley Airforce Base)

Location (State)

Hampton, VA 23665

# of Vaults

# of ATC

3. ALCMS/CCR - Advanced Preventive Maintenance

Inspection of All Computer Enclosures
Cleaning of all cooling fans, filters, and dust/debris
removal

Done

Notes
Network devices inspection
Verify proper seeding of all ethernet and
communication cables

Done

Notes
Database Evaluation and/or Repair
Check database for proper storage capacities and
backup restores

Done

Notes
Touchscreen Operational test and inspection
Touchscreen Calibration and Responsiviness test

Done

Notes
UPS testing and inspeciton
Five minute power test, remove from utility power to
verify proper alarms

Done

Notes
Printer Operational test and inspection
Create a test print, verify functionality

NA

Notes
Complete L-829 Operational testing
Testing of remote and local control and proper
feedbacks

Done

Notes
CCR Recording of Output Current, Voltage, VA, & IRMS
Data is captured and recorded by ADB SAFEGATE

ADB_Safegate - -

Done

- -

Date 24/04/26

AGL ALCMS/CCR-PMA Basic

Page

Notes
ACE/DCMU Diagnostics & Testing
Verify ACE communication, functioning overlays and
fiber connections

Done

Notes
Insulation Resistance (IRMS) Diagnostics & Testing
Verify accuracy and calibration of the IRMS module or
Done
megger card
Notes
On-site Repair (if spare parts are available)
Assist the maintenance personnel in pending repairs
when possible

Done

Notes
Spare Parts/Inventory Reccomendations
Submit parts quote request or orders if needed

NA

Notes
*Customer Representative acknowledges above PMA Completion Form carried out to, no less, than its contractual agreement by ADB SAFEGATE Representative. ADB SAFEGATE Represntative acknowledges that a detailed technical trip report will be submitted within fifteen business days of date listed below. Both, ADB SAFEGATE and Customer Representative, agree that a succesful PMA Completion Form is subject, but not limited to, inclimate weather, airport operations, escort, and/or access privileges. ADB Safegate Representative

ADB Representative Signature
Immer Adame
ADB Sign Date

2026-04-24

Customer Representative

Customer Representative Signature
Joe Gandarillas
Customer Sign Date

ADB_Safegate - -