PPPL General Provisions for Non-Commercial Subcontracts Part G - Provisions & Conditions for
Fixed Price Construction Subcontracts
The following clauses and conditions set forth below are hereby incorporated in and made part of the above-cited subcontract.
No.

Page
No.

Clause Title

G1.

PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

G2.

EXTRAS (APR 1984)

G3.

CHANGES (JUN 2007)

G4.

INSPECTION OF CONSTRUCTION (AUG 1996)

G5.

TERMINATION FOR CONVENIENCE OF PRINCETON (FIXED PRICE) (ALTERNATE I) (APR 2012)

G6.

DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984) ALTERNATE I (APR 1984)

G7.

SUSPENSION OF WORK (APR 1984)

G8

DIFFERING SITE CONDITIONS (APR 1984)

G9

SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

G10

SUPERINTENDENCE BY THE SUBCONTRACTOR (APR 1984)

G11

OTHER SUBCONTRACTS (APR 1984)

G12

USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

G13

LAYOUT OF WORK (APR 1984)

G14
G15

SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE I (APR 1984)

SAFETY DATA SHEET

GENERAL CONDITIONS FOR CONSTRUCTION SUBCONTRACTS

Page
No.

No.

Title

GC1

RESPONSIBILITIES OF THE PRINCETON ARCHITECT-ENGINEER

GC2

SUBCONTRACTOR’S PERFORMANCE

GC3

SPECIFICATIONS BY REFERENCE

GC4

STANDARD SPECIFICATIONS

GC5

CONSTRUCTION SAFETY, HEALTH AND FIRE PROTECTION

GC6

FIRE PERMIT

GC7

PLASMA PHYSICS LABORATORY SECURITY REQUIREMENTS

GC8

EXCAVATION PERMITS AND NOTICES

GC9

NOTICE TO PROCEED

GC10

SHOP AND EQUIPMENT DRAWINGS

GC11

SAMPLES, CERTIFICATES AND TESTS

GC12

SUBSTITUTIONS

GC13

INVOICES/CERTIFICATIONS

GC14

REPORTS

GC15

PROGRESS MEETINGS

GC16

CONSTRUCTION OPERATIONS AND PROCEDURES

GC17

UTILITY SHUTDOWNS

GC18

PROTECTION DURING CONSTRUCTION OPERATIONS

GC19

JOB CONDITIONS – TEMPORARY FACILITIES

GC20

ALTERATION WORK

GC21

NON-INTERFERENCE WITH PRINCETON OPERATIONS

PPPL-PD-G; Rev 8; 05-2022

PPPL General Provisions for Non-Commercial Subcontracts Part G - Provisions & Conditions for
Fixed Price Construction Subcontracts

GENERAL CONDITIONS FOR CONSTRUCTION SUBCONTRACTS

Page
No.

No.

Title

GC22

TEMPORARY PARTITION AND CLOSURES

GC23

INGRESS, EGRESS AND CIRCULATION

GC24

SHORING, BRACING AND BARRICADES

GC25

WEATHER CONDITIONS/WORK IN FREEZING WEATHER

GC26

DISPOSAL AND SALVAGE

GC27

PUMPING AND DRAINAGE

GC28

EXPLOSIVES

GC29

INTOXICATING LIQUORS

GC30

UTLIZATION OF PRINCETON EMPLOYEES

GC31

EATING FACILITIES

GC32

MATERIALS AND WARRANTIES

GC33

OPERATING AND MAINTENANCE MANUALS

GC34

AS-BUILT DRAWINGS

GC35

CLEANING UP

GF1

FAR CLAUSES INCORPORATED BY REFERENCE

PPPL-PD-G; Rev 8; 05-2022

PPPL General Provisions for Non-Commercial Subcontracts Part G - Provisions & Conditions for

The beginning of the document. Download the full file to read on.

Other documents in this bid