PPPL PQA Supplier Quality Survey R2 Construction
Updated
A PDF document (1.0 MB) attached to RF Roof Replacement Project, from the Department of Energy. Due Dec 10, 2026, 4:00 PM (UTC-5).
File name: 7. PPPL PQA Supplier Quality Survey R2 Construction.pdf
The full file is for paid members, or buy this bid alone.
Preview
PRINCETON PLASMA PHYSICS LABORATORY
PQA Supplier Quality Survey (Construction)
This survey is to be completed by the head of your Quality Department and returned to PPPL. Please attach your Quality Manual and your organization chart that includes the Quality function and
Note: navigate from field to field using the tab key or mouse.
Richard B. Kaser
Member
Checklist Completed By
Title
Date
April 12, 2024
The survey need not be completed if you have completed one within the last 12 months and there have been no significant changes. If so, check here. Would you be receptive to a site survey visit?
---
If requested, would you be willing to supply specific quality procedures in the future? --GENERAL INFORMATION Name of Facility
Years in Business
under this Name
Kaser Mechanical, LLC
Division or subsidiary of:
49 Folwell Station Rd
Facility Address
City
Jobstown
Mailing Address
Phone
State
NJ
Zip Code
08041 -
Zip Code
08041 -
49 Folwell Station Rd Jobstown NJ
609-353-1360
Principle Products/Services
General Construction
Are you currently certified to any quality standards
(ISO, ASME, etc.)? If so, please list them:
Identify the industry / national standard(s) that the
quality system follows?
PERSONNEL
Head of Quality Dept.
Richard B. Kaser
Phone
NA
238220
609-353-1360
[email protected] /
[email protected]
Reports to:
Production Manager
Phone
Reports to:
Administrative 2
Total No. of Personnel
Certified Welders 2
Inspection/Test
QA/QC
PQAS-C Rev 2 30-Apr-2019
QUALITY SYSTEM
Yes
No
Comments/Explanation
including Not Applicable (N/A)
No
Comments/Explanation
including Not Applicable (N/A)
Is there a formal quality system in place?
Is there a written Quality Manual?
Are there regular, documented, Quality Program audits?
Is formal document control implemented for project
deliverables i.e. submittals, shop drawings, etc.?
Is there a nonconformance system that includes
identification, segregation, customer notification and
concurrence, and action to prevent recurrence through
inspections, RFIs, change orders, or similar process?
Is there a calibration program that uses national
standards, specifies calibration frequency, and includes tracking of calibrated equipment status?
Do all personnel receive quality program training?
Do Quality personnel review contract documents?
Do Quality personnel witness inspections and tests?
Do Quality personnel witness special processes such as
welding or nondestructive testing?
The beginning of the document. Download the full file to read on.
Other documents in this bid
- PPPL-PD-G Provisions and Conditions for FP Construction Subcontracts Rev 8
- PPPL-PD-T Provisions For Work Performed On The PPPL Site-Rev
- Request for Proposals E-Verify Certification Document
- Request for Proposals Evaluation and Basis for Award
- Request for Proposals Instructions for Proposal Preparation
- Request for Proposals Invitation Cover Letter
- Request for Proposals Offeror Information and Pricing Form