Home / RF Roof Replacement Project / Document

PPPL PQA Supplier Quality Survey R2 Construction

Updated

A PDF document (1.0 MB) attached to RF Roof Replacement Project, from the Department of Energy. Due Dec 10, 2026, 4:00 PM (UTC-5).

File name: 7. PPPL PQA Supplier Quality Survey R2 Construction.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PRINCETON PLASMA PHYSICS LABORATORY

PQA Supplier Quality Survey (Construction)
This survey is to be completed by the head of your Quality Department and returned to PPPL. Please attach your Quality Manual and your organization chart that includes the Quality function and
Note: navigate from field to field using the tab key or mouse.

Richard B. Kaser
Member

Checklist Completed By
Title

Date

April 12, 2024

The survey need not be completed if you have completed one within the last 12 months and there have been no significant changes. If so, check here. Would you be receptive to a site survey visit?

---

If requested, would you be willing to supply specific quality procedures in the future? --GENERAL INFORMATION Name of Facility

Years in Business
under this Name

Kaser Mechanical, LLC

Division or subsidiary of:

49 Folwell Station Rd

Facility Address
City

Jobstown

Mailing Address
Phone

State

NJ

Zip Code

08041 -

Zip Code

08041 -

49 Folwell Station Rd Jobstown NJ

609-353-1360

Principle Products/Services

General Construction

Are you currently certified to any quality standards
(ISO, ASME, etc.)? If so, please list them:
Identify the industry / national standard(s) that the
quality system follows?

PERSONNEL

Head of Quality Dept.

Richard B. Kaser

Phone

NA
238220

609-353-1360

e-mail

[email protected] /
[email protected]

Reports to:
Production Manager

Phone

e-mail

Reports to:

Administrative 2

Total No. of Personnel

Certified Welders 2

Inspection/Test

QA/QC

PQAS-C Rev 2 30-Apr-2019

QUALITY SYSTEM

Yes

No

Comments/Explanation
including Not Applicable (N/A)

No

Comments/Explanation
including Not Applicable (N/A)

Is there a formal quality system in place?
Is there a written Quality Manual?
Are there regular, documented, Quality Program audits?
Is formal document control implemented for project
deliverables i.e. submittals, shop drawings, etc.?
Is there a nonconformance system that includes
identification, segregation, customer notification and
concurrence, and action to prevent recurrence through
inspections, RFIs, change orders, or similar process?
Is there a calibration program that uses national
standards, specifies calibration frequency, and includes tracking of calibrated equipment status?
Do all personnel receive quality program training?
Do Quality personnel review contract documents?
Do Quality personnel witness inspections and tests?
Do Quality personnel witness special processes such as
welding or nondestructive testing?

The beginning of the document. Download the full file to read on.

Other documents in this bid