RFP 27-005JR
Evaluation and Basis for Award
EVALUATION AND BASIS FOR AWARD
1.
EVALUATION OF PROPOSALS
PPPL will evaluate proposals submitted in response to this RFP and plans to award a Firm Fixed Price Subcontract to the Offeror whose proposal represents the Best Value to PPPL on the basis of 1) responsiveness; 2) Offeror’s capability; 3) “responsibility” determination; and 4) price, as explained below:
A. RESPONSIVENESS. PPPL will determine the responsiveness of each proposal on a pass/fail basis. A proposal will be considered to be “responsive” if it is in compliance with all the requirements of the RFP. PPPL reserves the right to consider any proposal “nonresponsive” and reject in total or in part, with or without prior discussion with the Offeror, if the proposal (a) is not submitted in the format specified in the RFP or does not include all of the information requested by PPPL; (b)
is not in accordance with the instructions contained in the RFP; or (c) contains material irregularities of any kind. Proposals determined non-responsive will be eliminated from further consideration for award. B. OFFEROR’S TECHNICAL CAPABILITY. In evaluating each Offeror’s overall capability to perform the work required by this RFP, PPPL will consider their technical approach, facilities and supply chain, schedule, and quality assurance program.
C. RESPONSIBILITY. PPPL will determine if an Offeror is a “responsible” prospective subcontractor, as the term is used in the Federal Acquisition Regulations (FAR) Subpart 9.1. Offerors determined not to be a responsible prospective subcontractor will not be eligible for award. D. PRICE. Price will be evaluated to determine if the Offeror’s proposed price is fair and reasonable. Unreasonably high or unrealistically low prices may be grounds for eliminating a proposal from consideration for award. 2.
SOURCE SELECTION DECISION
Upon receipt of proposals, PPPL may contact Offerors with a request for clarifications. Proposals will then be screened for responsiveness. Offerors whose proposals were determined to be non-responsive will be eliminated from further consideration. Proposals determined to be responsive will be evaluated using the methodology described in this document.
After receipt of proposals, PPPL intends to complete its evaluation without further discussions with Offerors. Therefore, Offerors’ initial proposal should contain the Offeror’s best terms and complete response from a price, schedule, quality, and technical standpoint.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- PPPL PQA Supplier Quality Survey R2 Construction
- PPPL-PD-G Provisions and Conditions for FP Construction Subcontracts Rev 8
- PPPL-PD-T Provisions For Work Performed On The PPPL Site-Rev
- Request for Proposals E-Verify Certification Document
- Request for Proposals Instructions for Proposal Preparation
- Request for Proposals Invitation Cover Letter
- Request for Proposals Offeror Information and Pricing Form