Home / ND NP THRO 204(1) Buck Hill Road / Document

Questions and Answers 10 27 2026 ND NP THRO 202 Buck Hill Road

Updated

A PDF document (139 KB) attached to ND NP THRO 204(1) Buck Hill Road, from the Federal Highway Administration. Due Nov 3, 2026, 2:00 PM (UTC-7).

File name: Questions and Answers 10 27 2026 ND NP THRO 202(1) Buck Hill Road.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

6982AF25B000004
ND NP THRO 204(1) Buck Hill Road
Questions & Answers
10/27/26
Page | 1
Questions
Received September 21, 2026
1Q. In response to the Buck Hill Road
landslide stabilization scope that is currently
in pre-solicitation, would the Owner be
interested in a value engineered solution
alternative to stabilize the landslide? The
current description details a large
excavate/replace operation, and we could
likely minimize disturbance in the National
Park with a soil nail stabilization option.
Please let me know if we can discuss.
Received October 6, 2026
2Q. Is there any type of prebid event planned?
3Q. Is the project location available for
viewing?
4Q. Are there any requirements to get into the
park to view the project?

Answers

1A. The Contractor needs to bid the plans as
is. The successful Contractor can submit a VE
proposal for evaluation after award.

2A. No pre-bid events are planned.
3A. The project location is accessible.
4A. Contact Theodore Roosevelt National
Park directly via email at
[email protected] for any
requirements. The NPS cannot answer any
questions concerning the project. All
questions must be emailed to
[email protected] in accordance with
the solicitation.

Received October 14, 2026
5Q. What is the period of performance for this 5A. Please see SCR Section 108.01 project?
Commencement, Prosecution and Completion
of Work starting on page E-13.
Received October 21, 2026
6Q. Will NDDOT Specifications be
6A. Please bid the project as is.
acceptable for the permanent sign installation
and materials?
7Q. Will NDDOT Specifications be
7A. Please bid the project as is.
acceptable for the temporary traffic control
signs instead of mounting signs on wood
posts?
Received October 22, 2026
8Q. The spec doesn’t specify IPS or DIPS for 8A. Please see Amendment 001. the Fusion Welded HDPE pipe.

6982AF25B000004
ND NP THRO 204(1) Buck Hill Road
Questions & Answers
10/27/26
Page | 2
Please advise which size you are looking for
when you have a chance.
9Q, Can one person "triple hat" as
Superintendent, SSHO and QC Manager?
10Q. Please provide the site visit attendee
sign in sheet.
11Q. Is there a bulk water fill i.e. a hydrant or
water source we can pump from for grading
operations in close proximity?
12Q. Does this project require phasing?

13Q. Is this project tax exempt?

The beginning of the document. Download the full file to read on.