STATEMENT OF WORK

RE V IS I ON

15 September 2026

Work Task #: 16002928
Location: Building 586
Project Title: Repair Restrooms and Drains
Capital Project #: 1145899
Project Manager: Robby Robinson
Project Manager Contact Information:
Office: 777-3672
Cell: (801) 648-3451
1.

General Requirements

1.1 The contractor shall bid and perform all work in accordance with requirements contained in the original contract specifications and this Statement of Work (SOW). 1.2 The contractor shall provide a TURNKEY proposal for all areas of the project, when completed and ready for final inspection, shall meet all pertaining codes and governments’ Statement of Work (SOW). 1.3 The contractor shall perform the service required after coordinating with SABER PM. Normal working hours are 0700 to 1600 Monday through Friday.
1.4 The contractor shall comply with UFC 1-200-01 (01 September 2022, Change 4, 17 December 2024), IBC Codes, NFPA Codes, NEC Codes, International Mechanical/Plumbing Codes, Hill AFB Section 1000 Standards, ASHRAE Standards, American Water Works Association (AWWA), State of Utah Administrative Code, Hill AFB Base Installation Facilities Standards (IFS) (https://www.wbdg.org/airforce/ifs/hill-afb-ifs) formerly the Base Facility Design Standard, UFC 3-580-01 Information and Communications Technology Infrastructure Planning and Design (21 November 2024), and all manufacturers installation, start-up and operation instructions for all material and equipment being installed. 1.5 The contractor shall use a Utah Certified and Licensed, Asbestos Containing Material (ACM) and Lead Based Paint (LBP) abatement contractor(s) for all ACM/LBP abatement. Two approved contractors are Environmental Abatement Inc. and Eagle Environmental.
1.6 The contractor shall notify the SABER Project Manager (PM) of a minimum of thirty (30) days prior to the requested outage date to allow for the coordination of multiple agencies. Failure to do so may result in project delays and the project period of performance will not be extended. Failure to perform all work during the outage time may cause a minimum of 21 days delay due to resubmittal and approval of new outage dates. All electrical and water outages shall be performed after hours, weekends or at customer’s discretion. All outage dates shall not exceed 5 days per outage without prior approval by SABER PM. 1.7 The CO's approval of submittals shall not be construed as a complete check but will indicate only that