Technical Volume Page Limit: Section L, Table 1 (Proposal Organization) states that the Technical Volume page limit is 60 pages, while the published Q&A refers to a 50-page Technical Volume limit. We believe this may be explained by the addition of Subfactor 5 (Rapid Mobilization and Concurrent Performance Plan), which carries its own 10-page allowance and is not yet reflected in Section L's table of contents or in Section M's evaluation factors. Could the Government confirm whether the 60-page limit represents 50 pages for Subfactors 1 through 4 plus a separate 10-page allowance for Subfactor 5, and whether Section L, Section M, and the Q&A will be reconciled to reflect this? The Rapid Mobilization Plan has been removed as a requirement. The technical volume page limit is 50 pages. Sections L & M have been updated to reflect this. Subfactor 5 in Section M: Section L, Paragraph 5.2.5 describes a detailed Rapid Mobilization and Concurrent Performance Plan as Subfactor 5 of the Technical Volume (10-page limit), and it appears in Section L's Volume Organization outline, but it is missing from Section L's table of contents and from Section M's evaluation factors. Could the Government confirm whether Section M will be updated to reflect Subfactor 5, and whether it will be evaluated as described in Section L? The Rapid Mobilization Plan has been removed as a requirement. Sections L & M have been updated to reflect this. What requirements are there for the conceptual drawings due with this proposal? If it’s Identified in the SOW include it in the drawing (PDF format does not need to be to scale). Provide sufficient information for the government to determine the contractor has full understanding of the project scope. Are the 35% shop drawings/construction drawings due with this proposal or after award? After award prior to construction start.
For the 35% Construction drawings, are we looking to show all architectural, plumbing, mechanical, electrical, IDS, Access control, and fire alarms for the entire building. Or just the reconfiguration of the restrooms, fire alarm plan, and the light layout? All aspects of the projects include: Architectural, Plumbing, Mechanical, Electrical, IDS, ACC, FA, Etc. 8C states that all new unground rough plumbing need to be replaced. How far are to replace? Does that include out to the Main? Only replace the underground in the footprint of the restrooms/janitors closet. See updated notes in plumbing section of SOW.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation Questions and Answers
- Attachment 12: Section L Instruction to Offerors
- Solicitation Questions and Answers
- Bldg 586 Seed Project FOPR Amendment 1
- Attachment 12: Section L Instruction to Offerors
- Attachment 13: Section M Evaluation Factors
- REV 1 - Seed Statement of Work Bldg 586
- Attachment 1: SABER 2027 Statement of Work
- Attachment 3: REV 2 - Seed Statement of Work Bldg 586