UT NP ARCH100 Bridges on Delicate Arch Road Hydraulics Report Signed
Updated
A PDF document (15.0 MB) attached to UT NP ARCH 100(2) Bridges on Delicate Arch Road, from the Federal Highway Administration. Due Nov 19, 2026, 2:00 PM (UTC-7).
File name: UT NP ARCH100(2) Bridges on Delicate Arch Road Final Hydraulics Report_Signed.pdf
The full file is for paid members, or buy this bid alone.
Preview
Bridges on Delicate Arch Road
Final Hydraulics Report
UT NP ARCH 100(2)
In partnership with:
National Park Service, Arches National Park
Grand County, UT
Federal Highway Administration
Central Federal Lands Highway Division
July 29, 2026
Signature Sheet
Report prepared by:
signed by LUIS GERARDO CALDERON
LUIS GERARDO CALDERON Digitally
Date: 2026.07.29 11:44:52 -06'00'
Luis Calderón, Lead Hydraulic Engineer
Report reviewed by:
Digitally signed by AMANDA ANN
AMANDA ANN
PETERS
Date: 2026.07.29 11:50:36 -06'00'
PETERS
Amanda Peters, Hydraulic Engineer
Report approved by:
signed by LUIS GERARDO CALDERON
LUIS GERARDO CALDERON Digitally
Date: 2026.07.29 11:52:07 -06'00'
Luis Calderón, Lead Hydraulic Engineer
Distribution
Electronic: N:\UT\arch100(2)\Hydraulics\9_Final-Report
Steven Davis, Project Management
Erin Jessee, Project Development, Design Team Leader
Jeff Felling, Project Development, Lead Designer
Carolyn Arroyo, Project Development, Lead Designer
Devin Dixon, Lead Geotechnical Engineer
Karl Eikermann, Supervisory Bridge Engineer
Brian Fauver, Environmental Protection Specialist
Ron Andresen, Materials Engineer
Kevin Vanzo, Construction Operations Engineer
Richard Vanderbeek, Land Surveyor (ROW)
2 | Page
UT NP ARCH 100(2) – Final Hydraulics Report
Executive Summary
Hydrologic and hydraulic analyses were conducted for the UT NP ARCH 100(2), Bridges on Delicate Arch Road project located in Arches National Park, Grand County, UT. The project scope is to replace 3 existing culvert crossings on Salt Valley, Salt, and Winter Camp Wash with bridges that will improve flood capacity and sediment transport. The adopted hydraulic capacity design frequency is the 10-year flood. This was selected in agreement with Arches NP as a compromise between project impacts and maintenance of flow connectivity. Design peak flows were estimated using USGS regression equations and an NRCS rainfall-runoff model conducted in HEC-HMS. Adopted flows are based on the lower bound of the regression equations.
Proposed conditions two-dimensional hydraulic modeling was conducted using SRH-2D to estimate water surface elevations, depths, and flow velocities at the project sites. The proposed configuration at the sites are bridge structures with 1V:3H spill-through abutment slopes. Low chord elevations at the three sites will provide a minimum of two feet of freeboard above the 10-year design flood but in most cases will exceed this criterion. For the design storms evaluated, only the Salt Wash bridge experiences pressure
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- UT NP ARCH 100 - Cross Sections-Option X
- UT NP ARCH 100 - Cross Sections-Option Y
- UT NP ARCH 100 - Cross Sections-Schedule A
- UT NP ARCH 100 Bridges on Delicate Arch Road Pavement Memo
- UT NP ARCH 100 Bridges on Delicate Arch Road-Delineators-Justification for Other Than Full and Open Competition
- UT PRA ARCH 100 As-Builts
- QnA
- Amendment A001