Addenda 2
Updated
A PDF document (164 KB) attached to Pip-Ii F-37 Building LWC Pump Room Piping System Installation, from the Department of Energy. Due Nov 19, 2026, 2:00 PM (UTC-6).
File name: Addenda_2.pdf
The full file is for paid members, or buy this bid alone.
Preview
ADDENDA NO.
SOLICITATION NO.
PROJECT NO.
TITLE OF PROJECT:
378854_MR
ADDENDA TO SOLICITATION
PIP-II F-37 LCW PUMP ROOM PIPING
DATE OF AMENDMENT: NOVEMBER 3, 2026
DATE ISSUED:
NOVEMBER 3, 2026
PROPOSAL DUE DATE: NOVEMBER 19, 2026
Bidders must acknowledge this amendment immediately upon receipt by one of the following methods: •
Via email to the FFDG Procurement Specialist
Below are clarification questions received (exactly as written), and FFDG’s answers for the above-referenced solicitation: Q1: Please provide the submittal for the heat exchanger for rigging? A1: Attached.
Q2: Clarify if there will need to be a Johnson Controls Interface with the Metyasys System as part of our scope of work. A2: No Johnson controls interface is needed.
Q3: Can we hydrotest shop fabricated pipe spools with regular water? A3: Yes, but they must be fully dried and cleaned.
Q4: Can flanged joint be substituted for field weld joints? A4: Please bid what is specified, and if you would like to substitute, please follow the process outlined in the RFP document, including providing a deduct price for the substitution. Q5: Are Van Stone Flanges allowed?
A5: Please bid what is specified, and if you would like to substitute, please follow the process outlined in the RFP document, including providing a deduct price for the substitution. Q6: Will there be electrical drawings issued with the bid documents for electricians to price their work? A6: No additional drawings will be issued.
Q7: Clarify the extent of our scope of work on the PLC Controls. A7: FNAL will do the programming, and you will be responsible only for wiring.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Fermi National Accelerator Laboratory
P.O. Box 500
Batavia, IL 60510
M.S 210
Michele Reynolds
PIP-II Procurement Manager
(630) 840-2448
Email: [email protected]
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Exhibit 10 ESH Requirements
- Exhibit 11 Submittals
- Exhibit 12 Quality Requirements
- Exhibit 13 CESHC
- Exhibit 16 2025 Construction Insurance Requirements
- Exhibit 18 Injury Illness Questionaire
- Exhibit 19 General Decision Number 05 18 2026
- Exhibit 20 SF1413-23a
- Exhibit 21 Bid Bond
- Exhibit 22 Payment Bond
- Exhibit 23 Performance Bond