Exhibit 16 2025 Construction Insurance Requirements
Updated
A PDF document (234 KB) attached to Pip-Ii F-37 Building LWC Pump Room Piping System Installation, from the Department of Energy. Due Nov 19, 2026, 2:00 PM (UTC-6).
File name: EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf
The full file is for paid members, or buy this bid alone.
Preview
INSURANCE REQUIREMENTS FOR CONSTRUCTION SUBCONTRACTS
1. Insurance: This clause applies to work performed at the Fermi National Accelerator Laboratory (Fermilab) worksite and incorporates the insurance requirements of Fermi Forward Discovery Group, LLC.
2. Minimum Insurance Coverage: Before undertaking any work under this Subcontract, the Subcontractor shall, except as otherwise approved by FFDG, take out and maintain at its own cost and expense, insurance coverages in at least the amounts listed below, through insurers with an A.M. Best rating of A, VII or higher.
LINE OF COVERAGE
LIMITS
GENERAL LIABILITY
EACH OCCURRENCE
$1,000,000
Commercial General Liability
General Aggregate Limit applies per
☒Occurrence ☒Project
GENERAL AGGREGATE
$2,000,000
PRODUCTS – COMPLETED OPERATIONS
$2,000,000
AGGREGATE
(To be maintained for at least 10 years after final
completion)
Coverage will be at least as broad as ISO form CG 00 01
AUTOMOBILE LIABILITY
COMBINED SINGLE LIMIT AND IN THE
Any Auto
AGGREGATE
☒Occurrence
Covering owned, non‐owned, and hired automobiles
$1,000,000
with coverage at least as broad as ISO Business Auto
Form CA 00 01
EXCESS LIABILITY
For all liability coverages required
☒Occurrence
following form of underlying insurance:
WORKERS’ COMPENSATION
For Subcontracts less than $3.5M
$1,000,000
For Subcontracts greater than $3.5M
$5,000,000
WC STATUTORY
As required by
OTHER
LIMITS
Illinois Law
E.L. EACH ACCIDENT
$1,000,000
EMPLOYER’S LIABILITY
E.L. DISEASE EA EMPLOYEE
$1,000,000
E.L. DISEASE‐POLICY LIMIT
$1,000,000
CONTRACTOR’S POLLUTION
EACH OCCURRENCE OR PER CLAIM
$1,000,000
Annual Aggregate or greater, depending on the extent
$1,000,000
LIABILITY
of the risk given the nature and scope of work; If policy is claims‐made, the retroactive date or prior acts
exclusion shall pre‐date the date of the Subcontract and the date services are first provided.
Coverage shall be maintained for a minimum of 5 years
after project completion or, if cancelled, maintain an
extended reporting period for 5 years after last work is performed.
CONTRACTOR’S PROFESSIONAL
*Applicable to subcontracts that have design/build,
LIABILITY
delegated design, or construction management services
Insurance Requirements ‐ Construction 01/2025
$1,000,000
☒ Claims Made and in Aggregate
requirements. The retroactive date or prior acts
exclusion shall pre‐date the date of the Subcontract and the date services are first provided. Coverage shall be maintained for a minimum of 5 years after project
completion or, if cancelled, maintain an extended
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Exhibit 10 ESH Requirements
- Exhibit 11 Submittals
- Exhibit 12 Quality Requirements
- Exhibit 13 CESHC
- Exhibit 18 Injury Illness Questionaire
- Exhibit 19 General Decision Number 05 18 2026
- Exhibit 20 SF1413-23a
- Exhibit 21 Bid Bond
- Exhibit 22 Payment Bond
- Exhibit 23 Performance Bond
- Exhibit 24 Sample Subcontract