Exhibit 24 Sample Subcontract

Updated

A PDF document (209 KB) attached to Pip-Ii F-37 Building LWC Pump Room Piping System Installation, from the Department of Energy. Due Nov 19, 2026, 2:00 PM (UTC-6).

File name: EXHIBIT_24_Sample Subcontract.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SUBCONTRACT NO. TBD

Subcontractor:
TBD

Fermi Forward Discovery Group LLC
Kirk Road & Wilson Street
P.O. Box 500 – Mail Station 210
Batavia, IL 60510-0500
FFDG Procurement Representative:
Name: Michele Reynolds
Title:
Procurement Manager
Phone: (630) 840-2448
E-Mail: [email protected]

Introduction
This is a firm fixed price subcontract (hereinafter “Subcontract”) for the construction work associated with the construction of PIP-II CPB HX and Pump, as further described herein. This Subcontract is between Fermi Forward Discovery Group, LLC and the party identified above as the “Subcontractor.”
This Subcontract is issued under Prime Contract No. 89243024CSC000002 between the United States Government (hereinafter “Government”), represented by the Department of Energy (hereinafter called “DOE”) and Fermi Forward Discovery Group, LLC (hereinafter “FFDG”) for the management and operation of the Fermi National Accelerator Laboratory.
Agreement
The parties agree to perform their respective obligations in accordance with the terms, conditions, and provisions of the attached SCHEDULE OF ARTICLES and the documents referenced or incorporated therein, which together with this Signature Page shall collectively constitute the entire Agreement and shall supersede all prior negotiations, representations, or agreements, whether verbal or written. TBD

FERMI FORWARD DISCOVERY GROUP, LLC

By:

By:

Name:

Name:

Title:

Title:

Date:

Date:

Signature Page
Subcontract No. TBD– PIP-II CPB HX and Pump

SCHEDULE OF ARTICLES

ARTICLE 1 – SCOPE OF WORK

A.

Description. The Subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision and equipment necessary to perform the work described in the Project Manual, PIP-II CPB HX and Pump Project No. 4-3-3G and Drawing Set, dated October 6, 2025, and other requirements as detailed in the specifications and drawings.

B.

Location. The principal location for the work to be performed by the Subcontractor shall be the Fermi National Accelerator Laboratory, located in Batavia, Illinois.

C.

Acceptance. Acceptance of the work under this Subcontract shall be based on the Subcontractor’s performance and completion of the work in consonance with high professional standards and compliance with the delivery and reporting requirements specified herein.

ARTICLE 2 – PERIOD OF PERFORMANCE

The work shall be completed within 180 calendar days upon receipt of the Notice-to-Proceed.