Exhibit 11 Submittals
Updated
A PDF document (146 KB) attached to Pip-Ii F-37 Building LWC Pump Room Piping System Installation, from the Department of Energy. Due Nov 19, 2026, 2:00 PM (UTC-6).
File name: EXHIBIT_11_013300 Submittals.pdf
The full file is for paid members, or buy this bid alone.
Preview
FFDG Submittals
June 2025
SECTION 013300 – SUBMITTALS
PART 1 GENERAL
1.1
PURPOSE
This section specifics general methods and requirements of project work related submittals. Additionally detailed submittal requirements may be found in the bid design and/or technical specification sections.
1.2
REFERENCES
The publications listed below form a part of this subcontract to the extent referenced. 010010
General Requirements
013100
Environment, Safety, and Health Requirements
1.3
SHOP DRAWINGS, MATERIAL SAMPLES, AND OPERATIONS MAINTENANCE
MANUALS
Subcontractor shall submit for all materials and assemblies used on the project which are normally required in the construction industry. In addition, project schedules shall be submitted using the “Submittal for Review Transmittal” found in Attachment A and logged as part of the submittal file.
Refer Construction Subcontract Terms and Conditions, for additional information on shop drawing submittals.
The Subcontractor shall supply six (6) copies of all operation and maintenance manuals or an electronic PDF version for equipment furnished by the Subcontractor or their Subtier contractor prior to final acceptance of the project by FFDG . The Subcontractor shall complete the "Submittal for Review Transmittal" form for each shop drawing submittal, reference Attachment A.
Shop drawings and schedules of all trades shall be submitted by the Subcontractor, who shall indicate by signed stamp on the drawings, that he has checked the shop drawings and that the work shown is in accordance with the Subcontract requirements and that it has been checked for dimension and relationship with the work of all trades. These drawings shall be submitted not later than the approved schedule for shop drawing transmittal, shall contain all required detailed information, and shall be submitted in logical order to facilitate proper review.
Shop drawings which relate to a complete assembly, structure or system with various parts shall not be submitted until all drawings required to completely detail that assembly, structure or system are complete, so that they may be checked in relation to each other.
SUBMITTALS
013300 - 1
FFDG Submittals
1.4
June 2025
IN LIEU OF THE AS-BUILT SHOP DRAWINGS
As specified in FFDG Construction Subcontract Terms and Conditions, the Subcontractor shall furnish As-Built drawings as outlined below. The Subcontractor shall maintain a set of prints of the Subcontract drawings in the construction office at the job site. A daily record, in red, shall be kept on these prints of
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Exhibit 10 ESH Requirements
- Exhibit 12 Quality Requirements
- Exhibit 13 CESHC
- Exhibit 16 2025 Construction Insurance Requirements
- Exhibit 18 Injury Illness Questionaire
- Exhibit 19 General Decision Number 05 18 2026
- Exhibit 20 SF1413-23a
- Exhibit 21 Bid Bond
- Exhibit 22 Payment Bond
- Exhibit 23 Performance Bond
- Exhibit 24 Sample Subcontract