Construction Environmental, Safety & Health Certification
(CESHC)
INSTRUCTIONS
This Construction Environmental, Safety & Health Certification (CESHC) is required for each construction project at DOE’s Fermi National Accelerator Laboratory site (Fermilab). See Technical Specification 013100 for further information. This document is a template for the CESHC designed to assist construction subcontractors in describing project conditions and developing project-specific hazards and controls information. The CESHC template is available in electronic format to facilitate editing. The prime subcontractor may either flow down this requirement to each of its subcontractors; or serve as a control and coordination point, requiring all subcontractors’ activities to be conducted under the prime subcontractor’s solitary CESHC.
Subcontractors must submit the completed CESHC to the FRA Procurement Office, which will distribute the document for review and concurrence by the FRA ES&H and Project Management teams prior to work commencing. The CESHC is intended to be a living document, which may be updated as necessary throughout a project as information changes or as the project progresses (e.g. – as additional Task/trade Hazard Analyses are developed, subcontractors added, etc.).
All of the sections in are required to be completed for each construction project, regardless of the size or complexity. Enter information in all of the fill-in blocks that are applicable. For those that are not applicable, enter “N/A” or other suitable explanation.
Fermilab
013100 CESHC INSTRUCTIONS 1 of 2
013100 - CESH Certifícate
Rev. 06/2020
PROJECT GOVERNANCE / EMERGENCY INFORMATION
Section 1 – Project Description and Emergency Contacts
Fill in the names and telephone numbers of the contact personnel for this particular project. In accordance with Title 10 of the Code of Federal Regulations, Part 851 (10 CFR 851), the Subcontractor must have a designated on-site safety representative who is knowledgeable of the project’s hazards and has the authority to correct unsafe conditions or behavior. This is either the Field Superintendent or a designated Subcontractor’s Safety Representative as delineated in Technical Specification 010010. Attach the qualifications of your safety representative’s resume’ for this project. If you have subcontractors performing work on this project, list their contact information. Update as necessary throughout the project. Section 2 – Subcontractor Policy Statement
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Exhibit 10 ESH Requirements
- Exhibit 11 Submittals
- Exhibit 12 Quality Requirements
- Exhibit 16 2025 Construction Insurance Requirements
- Exhibit 18 Injury Illness Questionaire
- Exhibit 19 General Decision Number 05 18 2026
- Exhibit 20 SF1413-23a
- Exhibit 21 Bid Bond
- Exhibit 22 Payment Bond
- Exhibit 23 Performance Bond
- Exhibit 24 Sample Subcontract