AIRFIELD CONSTRUCTION WAIVER APPLICATION FORM
1. Project or Work Order #
2. Contract #
3.Waiver # (Government Use Only)
INSTRUCTIONS: Requester MUST complete blocks 1, 2, 4-6, 8,10,11, if not applicable put N/A in the block. 4. Include a map with a detailed depiction of the construction location and submit with this form. 5. Description of Construction Activity: Include description of construction with notes pertaining to the work that will be done.
6. Facility Number (Closest to Construction Activity):
7. CRITERIA TO BE WAIVED (Government Use Only- State Chapter, paragraph, table number, etc. from UFC 3-260-01 or other):
Longitude:
N
Latitude:
A) Construction Activity Ground Elevation (Average Mean Sea Level):
W
Ft.
B) Tallest Construction Equipment Height (Crane Height, etc):
Ft.
Total Height (A+B):
Ft.
8. Location and Height Data of Construction Activity:
9. Why is the temporary waiver required?
h of c
10. Point of Contact Data:
CEC (THDR, Alutiq,etc.) Project Manager:
Phone & Email:
Contractor (Executing the work):
Phone & Email:
Construction Start Date:
Construction End Date:
11. Describe risk mitigation measures that will be taken for each violation/waiver. (eg. Special painting, obstruction lighting, barricades, marshallers, flagging, safety plan/recall procedures, etc.)
12. COORDINATION COMPLETED (Government Civil Engineering Use Only):
GROUND SAFETY
72 ABW/SEG
AIRFIELD OPERATIONS 72 OSS/OSA
LOGISTICS
72 LRS/DD
TERPS
HQ AFMC/A3
COMMUNICATIONS 72 CS/SCX
FLIGHT SAFETY
72 ABW/SEF
SECURITY FORCES 72 SFS/S5S
AIRFIELD MANAGER
72 OSS/OSAM
13. APPROVAL (Government Use Only) Installation Commander approval authority. If waiver is an emergency the Base Civil Engineer may approve according to UFC 3-260-01, B1-2.5.4.7.
Installation Commander
(Base Civil Engineer if Emergency)
Form Date: April 2018