Tinker AFB

Tinker General Requirements

SECTION 00 80 00

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

PART 1

1.1

GENERAL

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. The most current edition of the listed publications at the time of contract/delivery order award shall be used.

TINKER AIR FORCE BASE (TAFB)

TAFBI 13-204

1.2

(2021) Airfield Operations

DEWATERING EXCAVATED AREA

It shall be the Contractor's responsibility to protect the construction area from damage due to rainwater. The Contractor shall provide and maintain at the job site sufficient pumps to remove rainwater from the excavated area as soon as practicable.
1.3

HAUL ROUTES

The haul routes to be used by the Contractor shall be as directed on the project drawings or by the Contracting Officer.
1.4

AIRFIELD OPERATIONS

All contractor activities on the airfield shall be pre-coordinated with the Contracting Officer in conjunction with the Chief, Airfield Management (CAM) prior to the Contractor proceeding on the airdrome. The provisions

of TAFBI 13-204 and Section 00 80 05 SPECIAL PROVISIONS FOR WORKING ON OR

NEAR THE AIRFIELD shall be strictly adhered to.
All runways, taxiways and aprons shall remain open during this project, unless specified otherwise by the Contracting Officer. The height of construction vehicles and equipment shall be limited to 12 feet above the surface. Absolutely no equipment or personnel will be allowed on the aircraft movement area or within 200 feet of the runways without permission from the Tinker Control Tower.
All Contractor personnel who will be operating their equipment or vehicles within the movement area or on any aircraft-parking ramp shall receive flight line driver training and have portable radios capable of communicating with Tinker Ground Control for projects over seven days. The CAM may authorize certain contractors and other personnel to drive on the airdrome for short specified periods without completing the flight line driving training. However, Airfield Management will brief contractors and project engineers (or other supervisors responsible for the work being accomplished) and will provide flight line orientation for contractor vehicle operators prior to allowing them to drive on the airdrome.
January 2022

Section 00 80 00

Tinker AFB

Tinker General Requirements

Prior to commencing work on this project, the Contractor shall coordinate with the Contracting Officer for any airfield authorization passes that

The beginning of the document. Download the full file to read on.