Attachment 16 -Barillas Lookout
Updated
A PDF document (719 KB) attached to Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF, from the Forest Service. Due Nov 16, 2026, 2:00 PM (UTC-8).
File name: C05 Attachment 16 031005L050501-Barillas Lookout-20230906-SAR-DATA-V9.pdf
The full file is for paid members, or buy this bid alone.
Preview
USFS TOWER STRUCTURAL ANALYSIS FORM
Region/Forest:
Site Name:
Site ID:
Latitude:
Longitude:
Barillas Lookout
031005L050501
35°34'7.75"N
105°28'24.13"W
Tower Information
Tower Type:
SS
System Type:
Lookout
Tower Material:
Steel
Tower Height:
54’ 5”
Cross Section:
Square
Radiant horizontal 2L2.5x2x0.25 length 6fet 3 “
radiant diag 2L2.5x2.5x0.25 length 3’ 4.5”
has 2 bolt size ¾”
Inspector Name:
Inspection Date:
Last Inspection:
Engineer Name:
P&T Results:
Mohanad Ashor
9/6/2023
11/9/2022
Mohanad Ashor
Pass
Inspection Team Notes
second section and rest
Radiant horizontal L2.5x2x0.25
radiant diag L2.5x2.5x0.25
has 2 bolt size ¾”
not double angle
3rd section
Radiant horizontal Length L 2.5x2x0.25
radiant diag Length L 2.5x2.5x0.25
******************************************************
1 section
Radiant horizontal Length 4feet 10”
radiant diag L 7’1”
2nd section
Radiant horizontal L 4ft 3”
radiant diag 6’3”
3rd section
Radiant horizontal Length 3feet 4.5”
radiant diag Length 5’10”
4th section
Radiant horizontal Length
radiant diag Length
5th section
Radiant horizontal Length
radiant diag Length
Tower Leg:
Slab
Leg B
Leg C
Leg D
Leg AA
Leg BB
Leg CC
Leg DD
Tower Leg:
Leg A:
Leg B:
Foundation Information
Test Data
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Testing
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Foundation Dimensions
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Guy Strand
Guy Size
Guy Wire System Information
Tension Test Data (lbfs.) (Input Bottom to Top)
N/A
N/A
N/A
N/A
N/A
N/A
USFS TOWER STRUCTURAL ANALYSIS FORM
Leg C:
Leg D:
N/A
N/A
N/A
N/A
N/A
N/A
(Include: Distance from middle of tower to anchor, guy pull off elevation, fasteners, anchors, mounting, etc.) Tower Leg:
Guy System Bottom Configuration
Guy System Top Configuration
Anchor Plate
Anchor Rod
Gusset Plate
U-Bolt
Leg A:
Leg B:
Leg C:
Leg D:
Turnbuckle
Anchor Plate
Turnbuckle
Anchor Plate
Turnbuckle
Anchor Plate
Turnbuckle
Distance
Anchor Rod
Distance
Anchor Rod
Distance
Anchor Rod
Distance
USFS TOWER STRUCTURAL ANALYSIS FORM
Elevation
Gusset Plate
Elevation
Gusset Plate
Elevation
Gusset Plate
Elevation
Pull off Size
U-Bolt
Pull off Size
U-Bolt
Pull off Size
U-Bolt
Pull off Size
Mounted Equipment and Structures Inventory
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Attachment 1: Statement of Work
- Attachment 3: Specifications
- Attachment 4: Fire Plan and Guidelines
- Attachment 5: Wage Determination
- Attachment 6: Wage Determination
- Amendment 1: Provisions and Clauses
- Amendment 1
- Bid document
- Attachment 11: Encino LO Structural Data
- Attachment 12: Region 3-0310 Santa Fe National Forest - Encino LO
- Attachment 13 -Encino Lookout- 01