Home / Facility Enhancement and Maintenance IDIQ / Document

Attachment 21: JBLG Integrated Solid Waste Management Plan

Updated

A PDF document (2.0 MB) attached to Facility Enhancement and Maintenance IDIQ, from the Department of the Air Force. Due Nov 13, 2026, 12:30 PM (UTC-5).

File name: Attachment 21 - JBLG Integrated Solid Waste Management Plan.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

DEPARTMENT OF THE AIR FORCE

INTEGRATED SOLID WASTE MANAGEMENT PLAN

Joint Base Lindsey Graham, South Carolina
Sept 2026

INTEGRATED SOLID WASTE MANAGEMENT PLAN

ABOUT THIS PLAN

This installation-specific Environmental Management Plan (EMP) is based on the United States (U.S.) Air Force’s (AF) standardized Integrated Solid Waste Management Plan (ISWMP) template (version June 2020). This Plan is not an exhaustive inventory of all Solid Waste (SW) requirements and practices. Where applicable, external resources, including Air Force Instructions (AFIs), Department of the Air Force Instructions (DAFIs), Department of the Air Force Manuals (DAFMANs), Air Force Manuals (AFMANs), Air Force Playbooks, federal, state, local and Final Governing Standards (FGS), and permit requirements are referenced. The original ISWMP template was prepared by Oneida Total Integrated Enterprises (OTIE), under Master Contract No.: GS00F0006L, Order No.: 47QFSA20F0030, Proposal No.: ID07160008 / ID0420007.
Certain sections of this ISWMP begin with standardized, AF-wide “common text” language that addresses AF and Department of Defense (DoD) policy and federal requirements. This common text language is restricted from editing to ensure that it remains standard throughout all plans. The common text language is maintained and updated by the designated Office of Primary Responsibility (OPR) with assistance from the Office of Collateral Responsibility (OCR), as appropriate. Immediately following the AF-wide common text sections are installation sections.
The installation sections contain installation-specific content to address state, local, and installation-specific requirements. Installation sections are unrestricted and are maintained and updated by AF environmental sections and/or installation personnel. This version of the ISWMP was revised and updated by the 628th Civil Engineer Squadron (628 CES), Installation Management Flight (CEI), Environment Element (CEIE) located at 210 West Stewart Avenue, Building (Bldg.) 721, Joint Base Lindsey Graham, South Carolina. This document is optimized to be accessed and viewed electronically. The eDASH website at https://usaf.dps.mil/teams/10623/Charleston/SitePages/Home.aspx is the primary communication tool for AF EMPs.

ii | P a g e

INTEGRATED SOLID WASTE MANAGEMENT PLAN

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

APPENDICES

APPENDIX A - Data Call Totals
APPENDIX B - Air Force Integrated Solid Waste Management Plan Playbook APPENDIX C - Qualified Recycling Program (QRP) Business Plan

The beginning of the document. Download the full file to read on.

Other documents in this bid