Attachment 22: UFGS 01 33 29 Sustainability Requirements and Reporting
Updated
A PDF document (139 KB) attached to Facility Enhancement and Maintenance IDIQ, from the Department of the Air Force. Due Nov 13, 2026, 12:30 PM (UTC-5).
File name: Attachment 22 - UFGS 01 33 29 Sustainability Requirements and Reporting.pdf
The full file is for paid members, or buy this bid alone.
Preview
**************************************************************************
USACE / NAVFAC / AFCEC / NASA
UFGS-01 33 29 (February 2021)
Preparing Activity:
-----------------------------------Superseding
UFGS-01 33 29 (February 2017)
UFGS-01 33 29.05 20 (March 2019)
NAVFAC
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated April 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 29
SUSTAINABILITY REQUIREMENTS AND REPORTING
PART 1
GENERAL
1.1
REFERENCES
1.2
SUMMARY
1.3
SUBMITTALS
1.4
GUIDING PRINCIPLES VALIDATION (GPV)
1.4.1
Sustainability Action Plan
1.4.2
Calculations
1.5
SUSTAINABILITY SUBMITTALS
1.5.1
High Performance Sustainable Building (HPSB) Checklist
1.5.1.1
HPSB Checklist Submittals
1.5.2
"S" Submittals for Sustainability Documentation
1.5.3
Sustainability eNotebook
1.5.3.1
Sustainability eNotebook Format
1.5.3.2
Sustainability eNotebook Submittal Schedule
1.6
DOCUMENTATION REQUIREMENTS
1.6.1
Integrated Design Process
1.6.1.1
Design Submittal Documentation
1.6.2
Commissioning (Cx)
1.6.3
Optimize Energy Performance
1.6.3.1
Design Submittal Documentation
1.6.3.2
Construction Submittal Documentation
1.6.4
Energy Efficient Products
1.6.5
On-site Renewable Energy Generation
1.6.5.1
Design Submittal Documentation
1.6.6
Solar Domestic Hot Water (SDHW)
1.6.6.1
Design Submittal Documentation
1.6.7
Building-level Power Metering
1.6.7.1
Design Submittal Documentation
1.6.7.2
Construction Submittal Documentation
1.6.8
Indoor Water Use
1.6.9
Indoor Water Metering
1.6.9.1
Design Submittal Documentation
SECTION 01 33 29
1.6.9.2
Construction Submittal Documentation
1.6.10
Outdoor Water Use
1.6.10.1
Design Submittal Documentation
1.6.10.2
Construction Submittal Documentation
1.6.11
Outdoor Water Meters
1.6.11.1
Design Submittal Documentation
1.6.11.2
Construction Submittal Documentation
1.6.12
Alternative Water
1.6.12.1
Design Submittal Documentation
1.6.13
Stormwater Management
1.6.14
Ventilation and Thermal Comfort
1.6.14.1
Design Submittal Documentation
1.6.15
Daylighting
1.6.15.1
Design Submittal Documentation
1.6.16
Moisture Control
1.6.16.1
Design Submittal Documentation
1.6.16.2
Construction Submittal Documentation
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 10: JB CHS Approved Paint Colors
- Attachment 12: UFC Protective Coatings and Paints
- Attachment 14: Sample Project Statement of Work (Floorcovering)
- Attachment 15: Sample Project Statement of Work (Protective Coating)
- Attachment 20: Evaluation Factors (Section M)
- Attachment 3: Orangeburg
- Attachment 4: Berkeley
- Attachment 5: Charleston
- Attachment 6: Dorchester
- Attachment 7: Sumter
- Attachment 8: Past Performance Questionnaire
- Attachment 9: Contract Security Handbook