Attachment 23: UFGS 01 74 19 - Construction Waste Management and Disposal
Updated
A PDF document (85 KB) attached to Facility Enhancement and Maintenance IDIQ, from the Department of the Air Force. Due Nov 13, 2026, 12:30 PM (UTC-5).
File name: Attachment 23 - UFGS 01 74 19 - Construction Waste Management and Disposal.pdf
The full file is for paid members, or buy this bid alone.
Preview
**************************************************************************
USACE / NAVFAC / AFCEC / NASA
Preparing Activity:
USACE
UFGS-01 74 19 (February 2019)
Change 3 - 11/21
-----------------------------------Superseding
UFGS-01 74 19 (January 2007)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated July 2022
**************************************************************************
SECTION 01 74 19
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
JB Charleston (Oct 2024)
************************************************************************** NOTE: This guide specification covers the
requirements for the management of non-hazardous
construction waste and demolition debris/waste
materials.
Every project must use a properly edited version of
this guide specification.
This guide specification contains tailoring for AIR
FORCE, ARMY, NASA, NAVY, NAVFAC PAC, and NAVFAC SE.
Select/deselect tailoring prior to editing.
This specification section must be coordinated with
Section 02 41 00 [DEMOLITION][ AND ][DECONSTRUCTION]
and Section 01 57 19, TEMPORARY ENVIRONMENTAL
CONTROLS, and Section 01 33 29, SUSTAINABILITY
REQUIREMENTS AND REPORTING.
Requirements in this guide specification apply to
all DoD installations (including government owned /
contractor operated installations and tenant
activities) regardless of the funding source.
Adhere to UFC 1-300-02 Unified Facilities Guide
Specifications (UFGS) Format Standard when editing
this guide specification or preparing new project
specification sections. Edit this guide
specification for project specific requirements by
adding, deleting, or revising text. For bracketed
items, choose applicable item(s) or insert
appropriate information.
Remove information and requirements not required in
respective project, whether or not brackets are
present.
Comments, suggestions and recommended changes for
this guide specification are welcome and should be
submitted as a Criteria Change Request (CCR).
SECTION 01 74 19
**************************************************************************
PART 1
GENERAL
************************************************************************** NOTE: The DOD Integrated (Non-Hazardous) Solid
Waste Management Policy, requires all facilities to
meet a non-hazardous solid waste diversion goal of
60% Construction and Demolition Diversion. This
guide specification should be used to identify
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 10: JB CHS Approved Paint Colors
- Attachment 12: UFC Protective Coatings and Paints
- Attachment 14: Sample Project Statement of Work (Floorcovering)
- Attachment 15: Sample Project Statement of Work (Protective Coating)
- Attachment 20: Evaluation Factors (Section M)
- Attachment 3: Orangeburg
- Attachment 4: Berkeley
- Attachment 5: Charleston
- Attachment 6: Dorchester
- Attachment 7: Sumter
- Attachment 8: Past Performance Questionnaire
- Attachment 9: Contract Security Handbook