Attachment 24: UFGS 01 57 19 Temporary Environmental Controls
Updated
A PDF document (327 KB) attached to Facility Enhancement and Maintenance IDIQ, from the Department of the Air Force. Due Nov 13, 2026, 12:30 PM (UTC-5).
File name: Attachment 24 - UFGS 01 57 19 Temporary Environmental Controls.pdf
The full file is for paid members, or buy this bid alone.
Preview
**************************************************************************
USACE / NAVFAC / AFCEC / NASA
Preparing Activity:
NAVFAC
UFGS-01 57 19 (August 2022)
-----------------------------------Superseding
UFGS-01 57 19 (November 2015)
UFGS-01 57 19.01 20 (November 2015)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated July 2022
**************************************************************************
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
JB Charleston (May 2023)
************************************************************************** NOTE: This guide specification covers the
requirements for environmental protection and other
environmental temporary controls.
Use this specification for design and construction
projects located CONUS and OCONUS. Edit this
specification to the extent that is allowed and does
not conflict with the applicable Status of Forces
Agreements (SOFA), Host Nation-Funded Construction
Agreements (HNFA), and in some instances, Bilateral
Infrastructure Agreements (BIA), and
country-specific Final Governing Standards (FGS) or
the DoD Overseas Environmental Baseline Guidance
Document (OEBGD), DoD 4715.05. The OEBGD applies
when there are no FGS in place.
Only edit the parts of this specification section
that have bracketed choices.
Many States and Municipalities have more stringent
or additional requirements:
For Navy projects, use this section and those
portions of this section which contain State and
Local requirements. Add any further local
requirements into this section. Use these sections
for both Design-Bid-Build and Design-Build projects.
For Army projects. Edit this section to include
weblinks to the State or Local requirement. Add the
State and Local source to the Reference list and
cite within the body of this section. Clearly state
in this section deviations from the State and Local
requirements.
Adhere to UFC 1-300-02 Unified Facilities Guide
Specifications (UFGS) Format Standard when editing
this guide specification or preparing new project
specification sections. Edit this guide
SECTION 01 57 19
specification for project specific requirements by
adding, deleting, or revising text. For bracketed
items, choose applicable item(s) or insert
appropriate information.
Remove information and requirements not required in
respective project, whether or not brackets are
present.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 10: JB CHS Approved Paint Colors
- Attachment 12: UFC Protective Coatings and Paints
- Attachment 14: Sample Project Statement of Work (Floorcovering)
- Attachment 15: Sample Project Statement of Work (Protective Coating)
- Attachment 20: Evaluation Factors (Section M)
- Attachment 3: Orangeburg
- Attachment 4: Berkeley
- Attachment 5: Charleston
- Attachment 6: Dorchester
- Attachment 7: Sumter
- Attachment 8: Past Performance Questionnaire
- Attachment 9: Contract Security Handbook