Attachment 40: Contract Data Requirements List SE011 eMASS upload-download
Updated
A PDF document (109 KB) attached to TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV On-Ramp Opportunity, from the Department of the Army. Due Oct 30, 2026, 4:00 PM (UTC-6).
File name: ATT0040 CDRL SE011 eMASS upload-download.pdf
The full file is for paid members, or buy this bid alone.
Preview
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
D. SYSTEM/ITEM
1. DATA ITEM NO.
SE011
E. CONTRACT/PR NO.
8. APP CODE
17. PRICE GROUP
3. SUBTITLE
Enterprise Mission Assurance Support Service (eMASS)
upload/download
5. CONTRACT REFERENCE
N/A
N/A
X
F. CONTRACTOR
2. TITLE OF DATA ITEM
4. AUTHORITY (Data Acquisition Document No.)
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
See Blk 16
N/A
USAISEC
14.
DISTRIBUTION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
18. ESTIMATED
TOTAL PRICE
6. REQUIRING OFFICE
Sample Task 1 para 3.1.2 - 3.1.4, 3.2
b. COPIES
a. ADDRESSEE
16. REMARKS
Final
Draft
See Blk 16
COR
Date of first and subsequent submissions: The eMASS upload/download will follow the TM
same time-line of the end deliverables for the associated task or shall be completed by the Gov Project Lead
suspense date assigned with the tasking. If the suspense date cannot be met, the Contractor shall notify the Government immediately. If returned, a follow-on DRAFT is due no later than 3 business days after Contractor receipt of the Government’s comments. If comments are not provided within 2 business days of a DRAFT delivery, that DRAFT will become the FINAL.
Reg
Repro
Format: Export spreadsheet from eMASS.
Content: Provide a deliverable that is technically sound, logically organized, coherent, and free of typographical and grammatical errors.
Method of delivery One (1) soft copy of the eMASS upload/download shall be submitted to the Technical Monitor, Contracting Officer’s Representative (COR) and Government
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: TEIS IV Revised Performance Work Statement
- Attachment 2.5 item a CO 2-2023 USAISEC OPSEC Plan
- Attachment 3 2.5 item b 24-004 USAISEC Drafting Guide
- Attachment 4 2.5 item c 18-033 USAISEC VIS Software Design Criteria
- Attachment 5 2.5 item d SIPRNET Tech Impl Criteria V7
- Attachment 6 2.5 item e 13-033-1 Instructional Guide for Developing EIPs
- Attachment 7 2.5 item i UFC 4-140-03
- Attachment 8 2.5 item j I3A Technical Criteria (for OSP Only) - Copy
- Attachment 9 2.5 item n DISN-EN ICAN-DI Standards Specifications v1 09f
- Attachment 10 2.5 item f USAISEC Cyber Security Assessment and Security Engineering Manual V2.1
- Attachment 13: Contract Data Requirements List A003
- Attachment 24 1.6.1B ESS Network Diagram