Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

Bid document

Updated

A PDF document (40 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: 07 14 00.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Tinker AFB, OK

TAFB Technical Sprcifications 2019

SECTION 07 14 00

FLUID-APPLIED WATERPROOFING

PART 1

1.1

GENERAL

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C33/C33M

(2016) Standard Specification for Concrete
Aggregates

ASTM C578

(2016) Standard Specification for Rigid,
Cellular Polystyrene Thermal Insulation

ASTM C836/C836M

(2015) High Solids Content, Cold
Liquid-Applied Elastomeric Waterproofing
Membrane for Use With Separate Wearing
Course

ASTM D1056

(2014) Standard Specification for Flexible
Cellular Materials - Sponge or Expanded
Rubber

ASTM D1751

(2004; E 2013; R 2013) Standard
Specification for Preformed Expansion
Joint Filler for Concrete Paving and
Structural Construction (Nonextruding and
Resilient Bituminous Types)

ASTM D1752

(2004a; R 2013) Standard Specification for
Preformed Sponge Rubber Cork and Recycled
PVC Expansion

1.2

SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-03 Product Data
Fluid-Applied Membrane
Membrane Primer
Elastomeric Sheet
Flexible Foam-Backed Elastomeric Sheet
Solvent
April 2019

SECTION 07 14 00

Tinker AFB, OK

TAFB Technical Sprcifications 2019

Moisture Meter
Protection Board
Bond Breaker
Submit material description and physical properties, application details, and recommendations regarding shelf life, application procedures, and precautions on flammability and toxicity. SD-11 Closeout Submittals
Warranty
Information Card
Instructions To Government Personnel
Include copies of Safety Data Sheets for maintenance/repair materials.
1.3

PREWATERPROOFING CONFERENCE

Prior to starting application of waterproofing system, arrange and attend a prewaterproofing conference to ensure a clear understanding of drawings and specifications. Give the Contracting Officer 7 days advance written notice of the time and place of meeting. Ensure that the mechanical and electrical subcontractor, flashing and sheetmetal subcontractor, and other trades that may perform other types of work on or over the membrane after installation, attend this conference.
1.4

DELIVERY, STORAGE, AND HANDLING

Deliver waterproofing materials in manufacturer's original, unopened

The beginning of the document. Download the full file to read on.

Other documents in this bid