Bid document
Updated
A PDF document (90 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).
File name: 09 67 23.15.pdf
The full file is for paid members, or buy this bid alone.
Preview
**************************************************************************
USACE / NAVFAC / AFCEC
UFGS-09 67 23.15 (February 2021)
Preparing Activity:
-----------------------------------Superseding
UFGS-09 67 23.15 (August 2010)
NAVFAC
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated July 2025
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 67 23.15
FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
PART 1
GENERAL
1.1
REFERENCES
1.2
SUBMITTALS
1.3
QUALITY ASSURANCE
1.3.1
Qualifications of Certified Protective Coatings Specialist (PCS)
1.3.2
Coating Work Plan
1.3.3
Design Data
1.3.3.1
Environmental Control System
1.3.4
Test Reports
1.3.4.1
Joint Sealant Test Report
1.3.4.2
Daily Inspection Report
1.3.5
Certificates
1.3.5.1
Qualifications of Certified Industrial Hygienist (CIH)
1.3.5.2
Qualifications of Coating Inspection Company
1.3.5.3
Qualifications of QC Specialist Coating Inspector
1.3.5.4
Qualifications of Coating Contractors
1.3.5.5
Joint Sealant Certificates
1.3.5.6
Thin Film Flooring System Certificates
1.3.6
Product Data
1.3.6.1
Joint Sealant Manufacturer's Instructions
1.3.6.2
Thin Film Flooring System Manufacturer's Instructions
1.3.6.3
Water-Based Alkaline Degreaser
1.4
DELIVERY, STORAGE, AND HANDLING
1.5
COATING HAZARDS
1.6
JOB SITE REFERENCES
1.7
PATCH TEST DEMONSTRATION
1.8
WARRANTY
PART 2
2.1
2.2
PRODUCTS
JOINT SEALANT
THIN FILM FLOORING SYSTEM
SECTION 09 67 23.15
2.2.1
Primer Coat
2.2.2
Urethane Topcoat
2.3
WHITE ALUMINUM OXIDE NON-SKID GRIT
PART 3
EXECUTION
3.1
COATING SAMPLE COLLECTION
3.2
TILE AND TILE ADHESIVE REMOVAL
3.3
JOINT MATERIAL REMOVAL, RE-SAW CUTTING, CRACK CHASING
3.4
DEGREASING
3.5
COATING SYSTEM REMOVAL
3.6
SURFACE PREPARATION
3.7
JOINT TREATMENT
3.7.1
Install Backer Rod
3.7.2
Joint Sealant Application
3.8
PRE-APPLICATION TESTING FOR CONTAMINATION
3.9
COATING APPLICATION
3.9.1
Primer Application
3.9.2
Non-Skid Grit Broadcast
3.9.3
Application of Topcoats
3.9.3.1
First Topcoat
3.9.3.2
Second Topcoat
3.9.3.3
Walkway Stripe and Grounding Rod Markings
3.10
CURING
3.11
FIELD QUALITY CONTROL
3.11.1
Coating Inspector
3.11.2
Inspection
3.11.2.1
Daily Inspection Report
3.11.2.2
Inspection Logbook
3.11.2.3
Inspection Equipment
3.11.3
Adhesion Testing
3.12
FINAL CLEANUP