UFGS-09 67 23.15 (February 2021)

Preparing Activity:

-----------------------------------Superseding
UFGS-09 67 23.15 (August 2010)

NAVFAC

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated July 2025
**************************************************************************

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 67 23.15

FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM

PART 1

GENERAL

1.1

REFERENCES

1.2

SUBMITTALS

1.3

QUALITY ASSURANCE

1.3.1
Qualifications of Certified Protective Coatings Specialist (PCS)
1.3.2
Coating Work Plan
1.3.3
Design Data
1.3.3.1
Environmental Control System
1.3.4
Test Reports
1.3.4.1
Joint Sealant Test Report
1.3.4.2
Daily Inspection Report
1.3.5
Certificates
1.3.5.1
Qualifications of Certified Industrial Hygienist (CIH)
1.3.5.2
Qualifications of Coating Inspection Company
1.3.5.3
Qualifications of QC Specialist Coating Inspector
1.3.5.4
Qualifications of Coating Contractors
1.3.5.5
Joint Sealant Certificates
1.3.5.6
Thin Film Flooring System Certificates
1.3.6
Product Data
1.3.6.1
Joint Sealant Manufacturer's Instructions
1.3.6.2
Thin Film Flooring System Manufacturer's Instructions
1.3.6.3
Water-Based Alkaline Degreaser
1.4

DELIVERY, STORAGE, AND HANDLING

1.5

COATING HAZARDS

1.6

JOB SITE REFERENCES

1.7

PATCH TEST DEMONSTRATION

1.8

WARRANTY

PART 2

2.1
2.2

PRODUCTS

JOINT SEALANT

THIN FILM FLOORING SYSTEM

SECTION 09 67 23.15

2.2.1
Primer Coat
2.2.2
Urethane Topcoat
2.3

WHITE ALUMINUM OXIDE NON-SKID GRIT

PART 3

EXECUTION

3.1

COATING SAMPLE COLLECTION

3.2

TILE AND TILE ADHESIVE REMOVAL

3.3

JOINT MATERIAL REMOVAL, RE-SAW CUTTING, CRACK CHASING

3.4

DEGREASING

3.5

COATING SYSTEM REMOVAL

3.6

SURFACE PREPARATION

3.7

JOINT TREATMENT

3.7.1
Install Backer Rod
3.7.2
Joint Sealant Application
3.8

PRE-APPLICATION TESTING FOR CONTAMINATION

3.9

COATING APPLICATION

3.9.1
Primer Application
3.9.2
Non-Skid Grit Broadcast
3.9.3
Application of Topcoats
3.9.3.1
First Topcoat
3.9.3.2
Second Topcoat
3.9.3.3
Walkway Stripe and Grounding Rod Markings
3.10

CURING

3.11

FIELD QUALITY CONTROL

3.11.1
Coating Inspector
3.11.2
Inspection
3.11.2.1
Daily Inspection Report
3.11.2.2
Inspection Logbook
3.11.2.3
Inspection Equipment
3.11.3
Adhesion Testing
3.12

FINAL CLEANUP