SECTION 23 36 00.00 40
AIR TERMINAL UNITS
PART 1
GENERAL
Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS applies to work specified in this section.
1.1
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR DIFFUSION COUNCIL (ADC)
ADC Standards Manual
(2008; 5th Edition) Flexible Duct
Performance Installation Standards
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI 880 I-P
(2011) Performance Rating of Air Terminals
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 130
(2008) Method of Testing for Rating Ducted
Air Terminal Units
ASTM INTERNATIONAL (ASTM)
ASTM A653/A653M
(2015; E 2016) Standard Specification for
Steel Sheet, Zinc-Coated (Galvanized) or
Zinc-Iron Alloy-Coated (Galvannealed) by
the Hot-Dip Process
ASTM C1071
(2016) Standard Specification for Fibrous
Glass Duct Lining Insulation (Thermal and
Sound Absorbing Material)
ASTM E84
(2016) Standard Test Method for Surface
Burning Characteristics of Building
Materials
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250
(2014) Enclosures for Electrical Equipment
(1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70
(2017) National Electrical Code
NFPA 90A
(2015) Standard for the Installation of
Air Conditioning and Ventilating Systems
April 2019
SECTION 23 36 00.00 40
Tinker AFB, OK
TAFB Technical Sprcifications 2019
UNDERWRITERS LABORATORIES (UL)
UL 181
(2013) Factory-Made Air Ducts and Air
Connectors
UL 486A-486B
(2013; Reprint Jan 2016) Wire Connectors
1.2
ADMINISTRATIVE REQUIREMENTS
Coordinate layout and installation of air terminal units and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment, fire-suppression system, communication and security systems,and partition assemblies. 1.2.1
Pre-Installation Meetings
Submit itemized lists for all materials, equipment, and fixtures to be incorporated in the work 30 days prior to commencement of work. Ensure list includes manufacturer's style or catalog numbers, specification and drawing reference numbers, warranty information, and fabrication site information. Submit product data for each type of air terminal unit indicated, including rated capacities, furnished specialties, sound-power ratings, and accessories: