FFDG General Requirements
January 2026
SECTION 010010 – GENERAL REQUIREMENTS
PIP-II F-37 LCW System Piping System Installation
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
3.1
3.2
3.3
3.4
ATTACHMENT A
REQUEST FOR INFORMATION
ATTACHMENT B
QA/QC PUNCHLIST ITEM STATUS
GENERAL REQUIREMENTS
Project No. 121.04.04.03
010010 - 1
FFDG General Requirements
January 2026
SECTION 010010 – GENERAL REQUIREMENTS
PIP-II F-37 LCW System Piping System Installation
PART 1 GENERAL
1.1
PURPOSE
The following specification provides the project-specific requirements that are supplementary to the requirements of the Fermi Forward Discovery Group, LLC (FFDG) Subcontract General Provisions and the FFDG General Terms and Conditions for Construction.
The Subcontractor is required to plan, control, and deliver the final project according to the project specifications. The project must possess complete functional systems and be assembled safely and in quality fashion following industry standards, regulatory requirements, and best practices.
1.2
SUMMARY
The Subcontractor shall provide in the performance of the work under this subcontract all labor, materials, equipment, transportation, services, occupational exposure monitoring and supervision required to maintain work sites that meet the ES&H requirements found in Section 013100.
All major elements of the work are believed to be adequately described herein. The Subcontractor is expected, as a requirement of the Subcontractor’s qualifications, to utilize his or her knowledge and experience to anticipate, and include in the cost of the work any incidentals of work which may be required, but are not specifically expressed herein, in order to provide a complete and fully functional facility and/or system. Definitions and roles and responsibilities can be found in Section 013100. FFDG Construction Management Office:
Procurement Administrator: Michelle Reynolds, [email protected], (630) 8402448 Construction (Project) Manager: Matt Slabaugh, [email protected], (630) 8404375 Design Coordinator: Michael Hanson, [email protected], (847) 533-6990 Construction Coordinator: Rich White, [email protected], (630) 840-4411 ES&H Coordinator: Rob Beebe, [email protected], (630) 840-8732 Quality Assurance Coordinator, Tom Digrazia, [email protected], (630) 8405451
1.3
REFERENCES
The publications listed below form a part of this subcontract to the extent referenced. FFDG General Terms and Conditions for Construction (01/2022) 010010
General Requirements
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Exhibit 10 ESH Requirements
- Exhibit 11 Submittals
- Exhibit 12 Quality Requirements
- Exhibit 13 CESHC
- Exhibit 16 2025 Construction Insurance Requirements
- Exhibit 18 Injury Illness Questionaire
- Exhibit 19 General Decision Number 05 18 2026
- Exhibit 20 SF1413-23a
- Exhibit 21 Bid Bond
- Exhibit 22 Payment Bond
- Exhibit 23 Performance Bond