FFDG General Requirements

January 2026

SECTION 010010 – GENERAL REQUIREMENTS

PIP-II F-37 LCW System Piping System Installation
1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.8

1.9

1.10

1.11

1.12

1.13

1.14

1.15

1.16

1.17

1.18

3.1

3.2

3.3

3.4

ATTACHMENT A

REQUEST FOR INFORMATION

ATTACHMENT B

QA/QC PUNCHLIST ITEM STATUS

GENERAL REQUIREMENTS

Project No. 121.04.04.03

010010 - 1

FFDG General Requirements

January 2026

SECTION 010010 – GENERAL REQUIREMENTS

PIP-II F-37 LCW System Piping System Installation

PART 1 GENERAL

1.1

PURPOSE

The following specification provides the project-specific requirements that are supplementary to the requirements of the Fermi Forward Discovery Group, LLC (FFDG) Subcontract General Provisions and the FFDG General Terms and Conditions for Construction.
The Subcontractor is required to plan, control, and deliver the final project according to the project specifications. The project must possess complete functional systems and be assembled safely and in quality fashion following industry standards, regulatory requirements, and best practices.

1.2

SUMMARY

The Subcontractor shall provide in the performance of the work under this subcontract all labor, materials, equipment, transportation, services, occupational exposure monitoring and supervision required to maintain work sites that meet the ES&H requirements found in Section 013100.
All major elements of the work are believed to be adequately described herein. The Subcontractor is expected, as a requirement of the Subcontractor’s qualifications, to utilize his or her knowledge and experience to anticipate, and include in the cost of the work any incidentals of work which may be required, but are not specifically expressed herein, in order to provide a complete and fully functional facility and/or system. Definitions and roles and responsibilities can be found in Section 013100. FFDG Construction Management Office:
Procurement Administrator: Michelle Reynolds, [email protected], (630) 8402448 Construction (Project) Manager: Matt Slabaugh, [email protected], (630) 8404375 Design Coordinator: Michael Hanson, [email protected], (847) 533-6990 Construction Coordinator: Rich White, [email protected], (630) 840-4411 ES&H Coordinator: Rob Beebe, [email protected], (630) 840-8732 Quality Assurance Coordinator, Tom Digrazia, [email protected], (630) 8405451

1.3

REFERENCES

The publications listed below form a part of this subcontract to the extent referenced. FFDG General Terms and Conditions for Construction (01/2022) 010010
General Requirements