Utilities Infrastructure Project (UIP) - Subproject 1
New Chilled Water (CHW) Plant & Central Utility Building (CUB) Upgrades Issue for Bid (IFB) - Electrical Calculations
Project No.: 3-5-206B
Issue 1 | August 27, 2026
© Keys Photography
This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party.
Job number 288168-03
Arup US, Inc.
35 East Wacker Drive, Suite 1800
Chicago, IL 60601
USA
arup.com
1.
Introduction
2.
Design Criteria
2.1
2.2
Codes and Standards
Analysis and Design Software
3.
Calculations
3.1
Load Analysis
3.2
Preliminary Fault Current Calculation
3.3
Preliminary Arc Flash Analysis
3.4
Voltage Drop Calculation
Appendices
Appendix A
Load Analysis
A.1
Equipment Load Analysis
A-1
A-1
A-2
A.2
Load Analysis by Category
A-3
A.3
Existing Generator Load Calculation
A-4
Appendix B
Preliminary Fault Current Analysis
B.1
Preliminary Fault Current Analysis
B-1
B-1
B-2
Appendix C
Preliminary Arc Flash Analysis
C.1
Preliminary Arc Flash Analysis
C-1
C-1
C-2
Appendix D
Voltage Drop Calculation
D.1
Voltage Drop Calculation
D-1
D-1
D-2
Issue 1 | August 27, 2026 | Arup US, Inc.
1.
Introduction
This calculation package describes preliminary electrical design calculations which were used for the basis of the electrical design documents for the Fermi Utility Infrastructure Project Central Utility Building (CUB) renovation and expansion. The calculations presented herein are based on the latest design drawings and loading assumptions described within, and are subject to revision in future design phases.
2.
Design Criteria
2.1
Codes and Standards
The following lists supplemental electrical codes and standards applicable to the project which are considered within this calculation package.
•
2020 NFPA 70, National Electrical Code (NEC)
•
Fermilab’s ES&H Manual (FESHM), including:
−
•
Chapter 9000 – Electrical Safety
Fermilab FESS Design Guide, latest edition
2.2
Analysis and Design Software
The following programs were used in the analysis and preparation of this calculation package: •
ETAP 22.5.0
•
Internal Design Software (ArupCompute)
•
Microsoft Excel
3.
Calculations
Electrical calculations presented in this report include a load analysis at the main switchgear, a generator load analysis, a preliminary fault current calculation, and a preliminary arc flash analysis. The goal of these calculations
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Request for Proposals Instructions to Offerors
- Exhibit A - Scope of Work UIP CUB
- Exhibit F- Army Corp NPR-Letter
- Exhibit I - Statement of Acknowledgment
- Exhibit J - Fermilab Subcontractor Safety Information Questionnaire
- Exhibit K- Price Proposal Form
- Exhibit N- Bond Bid
- Exhibit O- (Rev 1.25) - Payment Bond
- Exhibit P- Performance Bond
- Exhibit S- Sample Firm-Fixed-Price Subcontract
- Amendment 1: to Request for Proposals
- Amendment 2: to Request for Proposals