Exhibit K- Price Proposal Form
Updated
A PDF document (734 KB) attached to Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB, from the Department of Energy. Due Nov 17, 2026, 4:00 PM (UTC-6).
File name: Exhibit K- Price Proposal Form.pdf
The full file is for paid members, or buy this bid alone.
Preview
REFERENCE
EXHIBIT K
REQUEST FOR PROPOSAL NO.
REQUEST FOR PROPOSAL
FERMI FORWARD DISCOVERY
GROUP, LLC
TO:
376508-CD
DATE
September 17, 2026
Fermi National Accelerator Laboratory
P. O. Box 500 – Mail Station 210
Batavia, Illinois 60510-0500
(Date of Offer)
Please enter your total firm fixed price in words and numbers:
)Firm Fixed Price
(Dollars)($
NAME OF PROJECT & LOCATION
Central Utility Building Addition and Renovation Construction, UIP Subproject 1 CUB. The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site in the Main Ring Area, adjacent to the city of Batavia, Illinois, in Kane and DuPage County.
This Offer may be accepted for a period of One Hundred Twenty (120) calendar days after the opening date unless the offeror specifies a longer acceptance period than FFDG’s minimum requirement. The Subcontractor Annual Representations & Certifications (SARC) is made a part of this subcontract.
ENCLOSED IS BID GUARANTEE, CONSISTING OF:
NAME OF BIDDER (Type or Print)
IN THE AMOUNT OF
FULL NAME OF ALL PARTNERS (Type or Print)
BUSINESS ADDRESS (Type or Print) Include Zip Code
EMPLOYER I.D. NO.
BY (Signature in ink)(Print or Type Name)
TITLE (Print or Type)
REQUEST FOR PROPOSAL NO:
TITLE OF PROJECT:
DUE DATE AND TIME:
SUBMITTAL LOCATION:
376508-CD
Central Utility Building Addition and Renovation
Construction, UIP Subproject 1- CUB
November 17, 2026, 4:00 p.m./Central Time All
proposal to be sent electronically to [email protected]
THE OFFEROR SHALL SUBMIT THIS COMPLETED FORM WITH THEIR WRITTEN PROPOSAL
PRICING/EVALUATION PAGE
Central Utility Building Addition and Renovation Construction, UIP Subproject 1- CUB 376508-CD
The scope of work consists of all labor, materials, transportation, overhead, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary as required to perform the Scope of Work for Central Utility Building Addition and Renovation Construction. All work in accordance with the attached solicitation documents.
PRICING:
BASE Bid: Firm Fixed Price
MEASUREMENT AND PAYMENT
1.01
1.02
SCOPE
A.
The scope of this section of the Contract Documents is to further define the items included in each Bid Item in the Bid Form section of the Contract Documents. Payment will be made based on the specified items included in the description in this section for each bid item.
B.
All contract prices included in the Bid Form section will be full compensation for all shop drawings, working drawings, labor, materials, tools, equipment, and incidentals necessary to complete the
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Request for Proposals Instructions to Offerors
- Exhibit A - Scope of Work UIP CUB
- Exhibit E- Electrical Calculations
- Exhibit F- Army Corp NPR-Letter
- Exhibit I - Statement of Acknowledgment
- Exhibit J - Fermilab Subcontractor Safety Information Questionnaire
- Exhibit N- Bond Bid
- Exhibit O- (Rev 1.25) - Payment Bond
- Exhibit P- Performance Bond
- Exhibit S- Sample Firm-Fixed-Price Subcontract
- Amendment 1: to Request for Proposals
- Amendment 2: to Request for Proposals