Fort Bliss Gravesite Expansion BD Part 10
Updated
A PDF document (19.9 MB) attached to Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 12, 2026, 10:00 AM (UTC-7).
File name: Fort Bliss Gravesite Expansion BD Part 10.pdf
The full file is for paid members, or buy this bid alone.
Preview
ABBREVIATIONS & SYMBOLS:
+/@
A.B.
A.P.A.
A.S.T.M.
ARCH.
B.B.
B.O.
BLK.
BM.
BOT.
BRG.
C
C.M.U.
CCJ
CJ
CL.
CLR.
COL.
CONC.
CONN.
CONT.
D.L.
D.T.
DBL.
DIA.
DIM.
DWL.
E.F.
E.J.
E.W.
EA.
EL.
ELEV.
EQ.
EX.
EXC.
EXP.
F.D.
FDN.
FT.
FTG.
G.C.
G.T.
GA.
GALV.
HC.
HORIZ.
HSS
I.F.
INT.
JST.
KLF.
KSI.
L
LB
LL
LLH
LLV
LONG.
LWC
M.C.
MAS.
MAX.
MECH.
MFG.
MIN.
MISC.
MTL.
N.
N.T.S.
NS.
O.C.
O.D.
O.F.
O.H.
OPNG.
ORIG.
P.A.F.
P.C.
PART.
PL.
PLF
PNL.
PSF
PSI
PW
R. OR
RAD.
R.D.
REINF.
REQD.
S.A.
S.B.
S.D.
S.D.L.
S.E.R.
A
B
C
6/10/2026 3:07:11 PM
D
F
C:\Users\JBuermann\Documents\18528-PIC RESTROOM-S-RVT23_jbuermannSRX3R.rvt
E
S.L.
S.L.L.
S.S.
SCHED.
SHT.
SIM.
SPA.
SPECS.
SQ.
STD.
STL.
T&B
T&G
T.O.
T.O.B.
T.O.J.
T.O.S.
T.O.W.
T.S.E.
TEMP.
THK.
TRANS.
TYP.
U.O.N.
V. / VER.
VERT.
W.L.
W/
W/O
WD.
WTS.
WWF
GENERAL CONSTRUCTION NOTES:
PLUS OR MINUS
AT
ANCHOR BOLT
AMERICAN PLYWOOD
ASSOCIATION
AMERICAN SOCIETY OF TESTING
MATERIALS
ARCHITECTURAL
BOND BEAM
BOTTOM OF
BLOCK
BEAM
BOTTOM
BEARING
CHANNEL
CONCRETE MASONRY UNIT
CONSTRUCTION CONTROL JOINT
CONTROL JOINT
CENTER LINE
CLEAR
COLUMN
CONCRETE
CONNECTION
CONTINUOUS
DEAD LOAD
DOUBLE TEE / DRAIN TILE
DOUBLE
DIAMETER
DIMENSION
DOWEL
EACH FACE
EXPANSION JOINT
EACH WAY
EACH
ELEVATION
ELEVATOR
EQUAL
EXISTING
EXCAVATION
EXPANSION
FLOOR DRAIN
FOUNDATION
FEET
FOOTING
GENERAL CONTRACTOR
GIRDER TRUSS
GAUGE
GALVANIZE
HOLLOWCORE
HORIZONTAL
HOLLOW STRUCTURAL SECTION
INSIDE FACE
INTERIOR
JOIST
KIPS PER LINEAR FOOT
KIPS PER SQUARE INCH
ANGLE
LEDGER BEAM
LIVE LOAD / DOUBLE ANGLE
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LONGITUDINAL
LIGHT WEIGHT CONCRETE
MECHANICAL CONTRACTOR
MASONRY
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MISCELLANEOUS
METAL
NORTH
NOT TO SCALE
NON-SHRINK
ON CENTER
OUTSIDE DIAMETER
OUTSIDE FACE
OVERHEAD
OPENING
ORIGINAL
POWDER ACTUATED FASTENER
PRECAST CONCRETE
PARTITION
PLATE
POUNDS PER LINEAR FOOT
PANEL
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PLYWOOD
RADIUS
ROOF DRAIN
REINFORCING
REQUIRED
STUD ANCHOR
SOIL BORING
SEE DETAIL
SUPERIMPOSED DEAD LOAD
STRUCTURAL ENGINEER OF
RECORD
SNOW LOAD
SUPERIMPOSED LIVE LOAD
STAINLESS STEEL
SCHEDULE
SHEET
SIMILAR
SPACING / SPACES
SPECIFICATIONS
SQUARE
STANDARD
STEEL
TOP & BOTTOM
TONGUE & GROOVE
TOP OF
TOP OF BEAM
TOP OF JOIST
TOP OF STEEL
TOP OF WALL
TOP OF STEEL ELEVATION
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Fort Bliss Gravesite Expansion BD Part 1
- Fort Bliss Gravesite Expansion BD Part 11
- Fort Bliss Gravesite Expansion BD Part 2
- Fort Bliss Gravesite Expansion BD Part 3
- Fort Bliss Gravesite Expansion BD Part 4
- Fort Bliss Gravesite Expansion BD Part 5
- Fort Bliss Gravesite Expansion BD Part 6
- Fort Bliss Gravesite Expansion BD Part 7
- Fort Bliss Gravesite Expansion BD Part 8
- Fort Bliss Gravesite Expansion BD Part 9
- Fort Bliss Gravesite Expansion - Specifications Full Book
- Solicitation