Fort Bliss Gravesite Expansion BD Part 2
Updated
A PDF document (15.9 MB) attached to Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 12, 2026, 10:00 AM (UTC-7).
File name: Fort Bliss Gravesite Expansion BD Part 2.pdf
The full file is for paid members, or buy this bid alone.
Preview
GENERAL NOTES
1.
A
PIV
PIV
PIV
PIV
CD103
3.
PIV
PIV
PIV
PIV
CD102
2.
LEGEND
ALL CURB SHOWN TO BE REMOVED AND
REPLACED ARE APPROXIMATE LOCATIONS AND
DIMENSIONS. CONTRACTOR TO COORDINATE
WITH COR FOR CURB REMOVAL LIMITS. ALL
CURB SHALL BE REMOVED WITH A FULL DEPTH
SAWCUT AT NEAREST JOINT AND REPLACED
IN-KIND. CONTRACTOR TO MATCH EXISTING
CURB TYPE, ELEVATIONS AND SLOPES FOR
NEW CURBS.
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
A
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
ALL PAVEMENT REMOVAL SHALL BE
TERMINATED WITH A FULL DEPTH SAWCUT. ALL
CONCRETE PAVEMENT AND WALK REMOVALS
SHALL BE TERMINATED WITH A FULL DEPTH
SAWCUT AT NEAREST JOINT.
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
ALL PAVEMENT REMOVAL FOR CURB
INSTALLATION SHALL BE REPLACED WHEN
COMPLETED PER DETAIL 8/CS501.
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
4.
5.
EX. SECTION MM
EX. SECTION II
EX. SECTION JJ
B
EX. SECTION G
FULL-DEPTH SAWCUT
REMOVE SHRUBS AND
PLANTINGS. REPLACE IN-KIND
CONTRACTOR SHALL OBTAIN ALL PERMITS
PRIOR TO CONSTRUCTION ACTIVITIES.
7.
CONTRACTOR TO INSTALL EROSION CONTROL
MEASURES PRIOR TO STARTING WORK. SEE
SHEET CE501.
8.
REPLACE IN-KIND ALL TREES & SHRUBS CALLED
OUT FOR REMOVAL WITHIN CONDUIT
INSTALLATION LIMITS. CONTRACTOR TO FIELD
VERIFY SIZE AND TYPE. PROTECT ALL TREES
AND SHRUBS NOT CALLED OUT TO BE
REMOVED.
CONTRACTOR TO FIELD VERIFY EXISTING
UTILITIES (ELEV, SIZE, TYPE...ETC) INSIDE
CONSTRUCTION LIMITS PRIOR TO EXCAVATION.
REMOVE & REPLACE TREE
IN-KIND
KEY NOTES
SEE SHEET CD111 FOR EXPANSION
AREA
C
11. PROTECT EXISTING GRAVESITES, PAVEMENTS,
UTILITIES, PLANTING, ETC. FROM DAMAGE. ALL
DAMAGE TO BE REPAIRED IN KIND AT NO COST
TO THE GOVERNMENT.
EX. SECTION L
CD107
D
N
PF
KEYMAP
NTS
EX. SECTION L1
E
CD109
V-102
CD102
CS102
V-103
CD103
CS103
V-104
CD104
CS104
V-105
CD105
CS105
V-107
CD107
CS107
V-109
CD109
CS109
F
OVERALL DEMOLITION PLAN
100'
200'
N
File Path: y:\18500\18528 va nca_ft bliss burial expansion correct fca_el paso, tx\_07 civil\_01 cad files\_01 sheets\18528_demo overall.dwg | edit:kstebbing | saved:4/17/2026 12:06 PM | plot:6/22/2026 2:44 PM
B
PK
F
REMOVE CONCRETE CURB &
GUTTER
REMOVE CONCRETE PAVEMENT
PK
E
CONTRACTOR SHALL REMOVE AND DISPOSE
ALL DEMOLITION ITEMS OFFSITE IN
ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL REQUIREMENTS.
REMOVE BITUMINOUS
PAVEMENT
10. COORDINATE ALL SHUTDOWNS A MINIMUM OF
48 HOURS OR MORE WITH COR/CEMETERY
STAFF.
D
EXISTING STORM SEWER INLET
6.
9.
EX. SECTION SS
C
CD105
EX. SECTION RR
EX. SECTION PP
EX. SECTION NN
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Fort Bliss Gravesite Expansion BD Part 1
- Fort Bliss Gravesite Expansion BD Part 10
- Fort Bliss Gravesite Expansion BD Part 11
- Fort Bliss Gravesite Expansion BD Part 3
- Fort Bliss Gravesite Expansion BD Part 4
- Fort Bliss Gravesite Expansion BD Part 5
- Fort Bliss Gravesite Expansion BD Part 6
- Fort Bliss Gravesite Expansion BD Part 7
- Fort Bliss Gravesite Expansion BD Part 8
- Fort Bliss Gravesite Expansion BD Part 9
- Fort Bliss Gravesite Expansion - Specifications Full Book
- Solicitation