MATERIAL LEGEND
13'-0"
13'-0" (DEMO SLAB)
PLAN & SECTION
4 TYP FL2
A
13'-0" (DEMO SLAB)
TURF
AREA
DE2
3 TYP
3 TYP FL3
13'-0"
FL4
EXISTING
HONOR
GUARD
SHELTER
TURF
AREA
TURF
AREA
EARTH
NEW CONSTRUCTION
GRAVEL / FILL
BRICK
METAL
BATT INSULATION
MORTAR NET
CMU
SOLID SURFACE
CONTROL JOINT,
TYP - SEE
STRUCTURAL
FL5
FL4
PLYWOOD
BRICK
RIGID INSULATION
CMU
SPRAY FOAM
CONCRETE
STONE
STONE
FIRE PROOFING
WOOD - HORIZONTAL
FL6
WOOD - VERTICAL
EXISTING
COMMITTAL
SHELTER
(NIC)
DE3
A
ELEVATION
GYPSUM BOARD
FL1
DE1
EXISTING
CONCRETE
EXISTING
HONOR
GUARD
SHELTER
TURF
AREA
SECTION
STUCCO
EXISTING
COMMITTAL
SHELTER
(NIC)
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
B
B
SITE KEY MAP
NTS
HONOR
GUARD
SHELTER 3302
C
C
DEMO FLOOR PLAN
1/4" = 1'-0"
DEMOLITION GENERAL NOTES
4'
8'
DEMOLITION PLAN SYMBOLS
DEMOLITION PLAN KEYED NOTES
1. CONTRACTOR MUST COORDINATE ALL DEMOLITION WORK, PHASING AND
SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING
PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING
PURPOSES ONLY, UNLESS NOTED OTHERWISE.
D
2'
2. CONTRACTOR MUST BE RESPONSIBLE FOR COORDINATING WITH ALL TRADES FOR
THE DEMOLITION WORK REQUIRED FOR THIS PROJECT..
DE1
DEMOLISH EXISTING REINFORCED CONCRETE SLAB AND ANY ASSOCIATED
EXPANSION JOINT MATERIAL BETWEEN REMOVED SLAB AND ADJACENT
PAVEMENT OR STRUCTURE
EXISTING WALL TO
REMAIN
DE2
REMOVE AND SALVAGE EXISTING METAL BENCHES AND FASTENING
HARDWARE
WALL OR
PARTITION TO BE
REMOVED
DE3
EXISTING CONCRETE SIDEWALK NOT IN CONTRACT
3. ALL DISTURBED AREAS, TURF, WALKWAYS, COLUMN FINISHES, ETC, DAMAGED BY
DEMOLITION WORK MUST BE PATCHED TO MATCH ADJACENT AREA.
DE10
6/12/2026 11:06:14 AM
DASHED LINE
INDICATES ITEM TO
BE REMOVED (UNO)
2. PROVIDE FIREPROOFING TO THE RATING REQUIRED AS INDICATED IN THE LIFE
SAFETY PLAN, CODE SUMMARY AND PER NFPA ON STRUCTURAL STEEL ELEMENTS.
4. PATCH AREAS DISTURBED OR MODIFIED BY THIS WORK WITH MATERIALS TO MATCH
EXISTING ADJACENT SURFACES OR SCHEDULED FINISHES AND TO A LIKE NEW
CONDITION.
6. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS
COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE
PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL
MEMBERS MUST BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL
ENGINEER.
5. ABBREVIATIONS AND SYMBOLS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL,
AND ELECTRICAL MAY VARY BY DISCIPLINE. SEE RESPECTIVE DISCIPLINE SECTIONS
AND/OR DRAWINGS FOR DEFINITIONS.
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
6. DEFINITIONS OF COMMON TERMS.
• FURNISH: TO SUPPLY AND DELIVER TO THE SITE, READY FOR INSTALLATION
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Fort Bliss Gravesite Expansion BD Part 1
- Fort Bliss Gravesite Expansion BD Part 10
- Fort Bliss Gravesite Expansion BD Part 11
- Fort Bliss Gravesite Expansion BD Part 2
- Fort Bliss Gravesite Expansion BD Part 3
- Fort Bliss Gravesite Expansion BD Part 4
- Fort Bliss Gravesite Expansion BD Part 5
- Fort Bliss Gravesite Expansion BD Part 6
- Fort Bliss Gravesite Expansion BD Part 7
- Fort Bliss Gravesite Expansion BD Part 9
- Fort Bliss Gravesite Expansion - Specifications Full Book
- Solicitation