W50S8R-27-B-A002 - PRE-BID CONFERENCE - SITE VISIT MINUTES
179 CW/MSC – Memorandum For Record
17 November 2026
SUBJECT: Pre-Bid Conference, Site Visit
Solicitation: W50S8R-27-B-A002, B422 BREAKROOM, B300 BDOC Location and/or Unit: 179th CW, Mansfield Ohio ANG
1. The site visit was conducted on 17 Nov 26, @ 10:00am. List of contractor attendees is attached. The following Government personnel were present:
a. Gordon Strom, 179CW Contracting Officer
b. Clayton McCarthy, 179CW Deputy Base Civil Engineer
2. Everyone was welcomed; handouts of slide show presentation were provided. The following was discussed (slides attached):
a. Subcontractors present (or not present) are not to be considered as an endorsement by the Government; they are welcome to attend, interact with other contractors as they choose. b. Any contractors present who have performed work for the Government are to keep discussions and conversations specific to this project only – no sidebar conversations or inquiries related to past, present or future work is to be a topic of discussion. The same applies to any relationships any contractor personnel may have with other Government personnel who they may know from previous experience.
c. Pictures are authorized. B300 will have some stipulations on what areas can be photographed.
d. Bid opening will be in same building/same room as the pre-bid conference. Contractors are cautioned – should they choose to hand-walk bid package to bid opening, to ensure they hand-deliver package to Contracting Officer no later than bid closing time. Time for contractors to gain base access should be accounted for. Contractors shall ensure they submit access form within 5 business days of bid opening, to ensure they have base access to attend (if planning to attend).
•
If planning to have bid delivered through mail service, it is the contractor’s responsibility to ensure their bid is delivered on base prior to the bid opening date and time.
e. Ensure solicitation is read thoroughly. Note the complete bid package submission requirements.
f. Submission of RFI’s should be in as timely a manner as possible, and will be answered in as expeditiously a manner as possible. In the event that pertinent RFI(s) submitted within the
W50S8R-27-B-A002 - PRE-BID CONFERENCE - SITE VISIT MINUTES
stated timeframes of solicitation are not answered in a timely manner, the bid opening date will most likely be extended to accommodate, via solicitation amendment (Contracting
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1a B422 Breakroom Statement of Work
- Attachment 1b B422 Breakroom Drawings
- Attachment 2a B300 BDOC Statement of Work
- Attachment 2b B300 BDOC Drawings
- Exhibit A Sealed Bid Checklist Reminders
- Exhibit B Checklist for Bid Bonds
- Breakroom and B300 BDOC
- Contractor Access form
- 0001 Amendment 1 (conformed copy)
- 0001 Amendment 1
- Attachment 1c B422 Breakroom Specifications
- Attachment 2c B300 BDOC Specifications