Request for Information Responses
Updated
A Word document (26 KB) attached to 16292 Steam Boiler Replacement, from the Department of the Air Force. Due Oct 30, 2026, 12:00 PM (UTC-6).
File name: RFI Responses 10-16-2026.docx
The full file is for paid members, or buy this bid alone.
Preview
As the government is accepting questions through 5 October 2026 and the bids are due (with design concepts and proposals) by 19 October 2026, will the government please extend the bid date? This will provide ample time for the government to review and respond to RFI's and release back to contractors, contractors to review and implement those responses into their proposals and conceptual designs and submit their finished proposals to the government. Bid Date is extended.
The solicitation now reads that the awarding terms of this contract will be LPTA (lowest price technically acceptable). The SOW section 4, paragraphs 4.1 and 4.2 state that it will be a BVTO (best value trade-off). These are vastly different awarding methods. Will the government please amend and clarify what the award will be based on? This will be Best Value Trade-Off
Please confirm that a full-time superintendent will be required on this project and must be onsite at all times and cannot be assigned any other projects? The superintendent should visit the site at least once on every day whenever work is being performed. They may be assigned to other projects during non-construction times. They must be able to be contacted during working hours.
Please confirm that a full-time SSHO will be required on this project and must be onsite at all times and cannot be assigned any other projects? The SSHO should visit the site at least once on every day whenever work is being performed. They may be assigned to other projects during non-construction times. They must be able to be contacted during working hours.
Please confirm if dual-hatting will be allowed for construction project management? The QCM and PM or Superintendent shall not be the same individual. Other roles may be “dual-hatted.”
The SOW states in section 1.2 that "building 1515 is divided into four phases, and each phase has it's own steam-water exchange system." Please confirm if the government intends for this project to be phased where the contractor will demo and replace each boiler at separate times and cannot all be done at once? All 4 phases will be available for construction when the steam is shut off. Phasing for each mechanical room is not intended.
The SOW states in section 1.2.3 that the new intended system is gas fired. Please confirm that the needed gas main lines are already existing in the mechanical rooms and the contractor would just be installing branch piping as needed to as stated in section 1.2.5 "installation of required natural gas piping...for a complete hot water heating system"? Gas lines and meters exist at each phase. Site visit should have provided information about the supply and meters. Contractor is to determine if meter is sufficient for their intended equipment to be installed.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- 16292 Boiler Replacement Statement of Work
- 16292 Solicitation Boiler Replacement
- 16292 Wage Determinations
- Bldg- 1515 WT Removal of Steam Lines
- Hill AFB IFS Mechanical Systems Design Requirements
- Hill AFB IFS Natural Gas LPG
- Hill AFB IFS Electrical
- 16292 Solicitation Boiler Replacement Amendment 1
- Questions