VISN 2 St Albans -Queens- Data Center - Civil SIte Plan
Updated
A PDF document (888 KB) attached to VISN 2 EHRM Industry Day, from the Department of Veterans Affairs. Due Nov 12, 2026, 2:00 PM (UTC-5).
File name: VISN 2 St Albans -Queens- Data Center - Civil SIte Plan.pdf
The full file is for paid members, or buy this bid alone.
Preview
GENERAL NOTES
WINDOW WELL
ELEV TO BOTTOM: 27.1
N:191050
1.
TW35.01
BW34.90
E:1048150
E:1048150
CONCRETE WALL
A
TW34.99
BW34.72
TW35.04
BW33.50
TW35.01
BW33.68
CONCRETE WALL
BUILDING 91
3.
TW35.03
BW34.39
WINDOW WELL
ELEV TO BOTTOM: 27.1
4.
BW35.21
TW35.44
BW33.28
TW35.39
BW34.95
TW34.42
BW33.91
TW35.06
WINDOW WELL
ELEV TO BOTTOM: 27.1
TW35.41
BW35.29
BW33.52
TW35.04
TW35.06
SILL37.87
TE
E
R
NC
O
C
TW38.39
BW34.08
BW34.04
TW35.08
WINDOW WELL
ELEV TO BOTTOM: 27.1
MP
A
R
6.
BW35.44
TW35.71
TW35.75
BW34.31
CONCRETE
PAD
TW35.66
BW35.31
BW35.27
BW35.24
TW35.79
TW35.65
BW35.27
9'-0''
TW38.14
BW34.68
TW35.10
BW34.22
TW38.15
BW34.50
8.
9.
WINDOW WELL
ELEV TO BOTTOM: 27.1
TW35.79
BW35.31
TW35.75
BW35.25
TW35.08
BW34.07
7.
WINDOW WELL
TW35.67 ELEV TO BOTTOM: 27.0
B
TW35.11
BW34.11
5.
MULTI-STORY
BRICK & CONC.
BUILDING
TW35.39
BW35.09
BW33.41
MULTI-STORY
BRICK & CONC.
BUILDING
2.
N:191050
10.
TW35.71
BW35.22
11.
12.
WINDOW WELL
ELEV TO BOTTOM: 27.1
SILL37.81
13.
SILL33.48
BW33.34
TW34.54
TW34.55
BW33.38
TE
RE
NC
CO
BW33.35
TW34.49
NEW DATA CENTER
4'-0"
A
B
C
KEYED NOTES
5'-4"
K
AL
C
14.
W
GRATE
ELEV:33.18
9'-0"
ALL INFORMATION SHOWN TO THE BEST OF
KNOWN ACCURACY BASED ON TOPOGRAPHIC,
GROUND-PENETRATING RADAR AND VISUAL
ONSITE SURVEYS IN ADDITION TO ASBUILT
INFORMATION.
CONTRACTOR SHALL PROVIDE AND MAINTAIN A
STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) COMPLIANT WITH VA AND EPA
REQUIREMENTS. PLAN TO BE UPDATED AND
MAINTAINED ONSITE FOR INSPECTIONS.
CONTRACTOR SHALL MAINTAIN AND PROTECT
STORM DRAINAGE AT ALL TIMES.
CONTRACTOR SHALL KEEP SITE CLEAN AND FREE
OF TRASH OR OTHER DEBRIS. TRASH OR DEBRIS
TO BE PLACED AND SECURED IN COVERED BINS
OR DUMPSTER.
CONTRACTOR SHALL VERIFY ALL SITE UTILITIES
AND FEATURES IN THE FIELD PRIOR TO
EXCAVATION, AFTER CALLING FOR UTILITY
LOCATING SERVICES.
IF ANY DIFFERING SITE CONDITIONS ARE
ENCOUNTERED, CONTACT COR PRIOR TO
PERFORMING ANY WORK.
ALL UTILITY WORK TO COMPLY WITH VA AND
LOCAL UTILITY, CITY, OR STATE REQUIREMENTS.
CONTRACTOR SHALL PROVIDE TEMPORARY SITE
FENCING.
ALL EXCAVATIONS SHALL COMPLY WITH OSHA OR
MORE STRINGENT REQUIREMENTS, IF ANY. A
COMPETENT PERSON MUST INSPECT ALL
EXCAVATIONS EACH DAY PRIOR TO PERSONNEL
ENTRY.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
AIR QUALITY OR OTHER REQUIRED PERMITS.
CONTRACTOR SHALL SET ALL UTILITY VAULTS,
MANHOLES, BOXES, AND INLETS FLUSH WITH NEW
PAVING.
CONTRACTOR SHALL PROVIDE FOR APPROVAL,
SHOP DRAWINGS OF NEW SIDEWALK AND CURBS
The beginning of the document. Download the full file to read on.