Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

2020 TAFB Facility Standard

Updated

A PDF document (5.8 MB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: 2020 TAFB Facility Standard.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

TINKER AIR FORCE BASE

FACILITY STANDARD

2020 Edition

Base Civil Engineer 72 ABW/CE
th
7535 5 ST, Ste 101
Tinker Air Force Base, Oklahoma 73145-9010
Telephone 405-734-3451
Fax 405-734-5535

APPROVING OFFICIAL:

Digitally signed by

WILSON.STEPHANIE.PE WILSON.STEPHANIE.PETERENIA.1063

TERENIA.1063234377 234377

Date: 2020.09.21 16:29:24 -05'00'

Stephanie Wilson
Base Civil Engineer
Civil Engineer Directorate, 72 ABW

Issued: AUG-2020

Part 1: Project Procedures
Chapter

Page

1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.

Introduction
Office of Primary Responsibility (OPR)
Application of the Standard
How to Use the Standard
TAFB 72 ABW/CE as the Authority-Having-Jurisdiction
BCE Project Submittal Requirements
BCE Function at TAFB

2.1

Order of Project Requirements
Construction Documents - Signed/Sealed requirements
Design Publications incorporated by reference to the Standard Model Building Codes and Construction Regulations
Occupational Safety and Health Act / OSHA Regulations
National Fire Protection Association
Accessibility
Sources of Technical and Procedural Requirements
Responsibilities of the Contractor
Variance from the Standard

4.1
4.2

Base Maps

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10

General
Change Order Documentation

TINKER AFB FACILITY STANDARD

AUG-2020

5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11

CE Recordkeeping
Dual Records
Delivery Media
CADD File Formats
Documentation
Image Files
CADD File Formats
CADD Standards
Specifications Formatting
Base General Requirements TAFB
Additional Geographic Information Systems Data

Part 2: Base Infrastructure
Chapter

Page

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10

Water Supply
Wastewater Treatment
Piping, Utilities, and Manholes
Sanitary Water Supply
Sanitary Sewer Collection Systems
Industrial Wastes
Oil Separators
Storm Drainage System
Natural Gas Delivery Systems
Liquid Fuel Supply Systems

7.1
7.2
7.3
7.4
7.5

Standard Facility signs
Zip + 4 Program Implementation
Logos and Super Graphics
Highway Standards and Traffic Control
Identification of Hazardous Storage

8.1
8.2
8.3

Traffic Considerations
Signage
Parking

9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9

Mandatory publications
Asbestos Containing Materials (ACM)
Lead-Based Paint
PCB Filled Ballast and Universal Waste Lamps

The beginning of the document. Download the full file to read on.

Other documents in this bid