Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

2026 TAFB Electrical Standard - Signed

Updated

A PDF document (523 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: 2026 TAFB Electrical Standard - Signed.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

TINKER AIR FORCE BASE

ELECTRICAL STANDARDS

2026 Edition

Base Civil Engineer 72 ABW/CE
7535 5th St, Ste 101
Tinker Air Force Base, Oklahoma 73145-9010
Telephone 405-734-3451
Fax 405-734-5535

APPROVING OFFICIAL:

Digitally signed by

WILSON.STEPHANIE.P WILSON.STEPHANIE.PETEREN

ETERENIA.1063234377 IA.1063234377

Date: 2026.02.02 10:46:37 -06'00'
Stephanie P. Wilson
Base Civil Engineer
72d Civil Engineering Directorate

SECTION

1.

2.

3.

PAGE

1.1
1.2
1.3
1.4
2.2
2.3
2.4
2.5
2.6
2.7
2.8
3.1
3.2
3.3
3.4
3.5
3.6
3.7
Page i

3.8

4.
5.
6.
7.

3.9
6.1
6.2

Page ii

TAFB ELECTRICAL STANDARDS

Tinker Air Force Base, Oklahoma
2026

1. General

1.1

References
As a minimum, all electrical work performed on Tinker AFB shall conform to the latest edition of the following codes/standards, and all applicable UFCs, AFMANs, and AFIs: (1)

NFPA 70, National Electrical Code (NEC)

(2)

NFPA 70E, Standard for Electrical Safety in the Workplace

(3)

NFPA 72, National Fire Alarm and Signaling Code

(4)

NFPA 101, Life Safety Code

(5)

NFPA 170, Standard for Fire Safety and Emergency Symbols

(6)

NFPA 780, Standards for Installation of Lightning Protection Systems

(7)

IEEE C2, National Electric Safety Code (NESC)
UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-460-01, Design: Petroleum Fuel Facilities

(8)

UFC 3-501-01, Electrical Engineering

(9)

UFC 3-520-01, Interior Electrical Systems

(10) UFC 3-530-01, Interior and Exterior Lighting Systems (11) UFC 3-535-01, Visual Air Navigation Facilities
(12) UFC 3-540-01, Engine-Driven Generator Systems for Prime and Standby Power Applications
(13) UFC 3-550-01, Exterior Electrical Power Distribution (14) UFC 3-560-01, O&M: Electrical Safety
(15) UFC 3-570-01, Cathodic Protection
(16) UFC 3-570-06, O&M Cathodic Protection Systems
(17) UFC 3-575-01, Lightning and Static Electricity Protection Systems (18) UFC 3-580-01, Information and Communications Technology Infrastructure Planning and Design
(19) UFC 3-600-01, Fire Protection Engineering for Facilities (20)

The beginning of the document. Download the full file to read on.

Other documents in this bid