LIGHTING CONTROL - SEQUENCE OF OPERATION

TAG
A

ACTIVATION

Panelboard: PANEL A

DECRIPTION

MANUAL ON/OFF

SCHEDULE

MANUAL LINE VOLTAGE TOGGLE SWITCH

Voltage: 208 V, 3Ø, 4W
Bus Rating: 250 A
Neutral: 100%
Feed-Thru Lugs: No
Features &
Modifications: -

Location: EXISTING HVAC 106
Supply:
Mounting: Surface
Enclosure: NEMA 1

N/A

ELECTRICAL GENERAL NOTES

Mains Type: MCB
Mains Rating: 225 A
Mains FN/Note: SCCR: 10 kA

NOTES: EXISTING PANELBOARD TYPE PRL-1A

A
Ckt
A-1
A-3
A-5
A-7
A-9
A-11
A-13
A-15
A-17
A-19
A-21
A-23
A-25
A-27
A-29
A-31
A-33
A-35
A-37
A-39
A-41

Description

LIGHTING

RESTROOMS LIGHTING

Trip (A) Poles FN/Note
E
E

Phase A
Load (VA)

OUTSIDE/INSIDE SITTING LIGHTS

FIRE CONTROL

E
E

WATER HEATER

E

ER #2

CONTROLLER #2

E
E

WOMENS HAND DRYER

E

MENS HAND DRYER

E

FLAG POLE LIGHTS NORTH

FLAG POLE LIGHTS SOUTH

E
E

Connected Load:
Connected Current:

B
Load Classification

Connected

Phase B
Load (VA)

Phase C
Load (VA)

E
E

RESTROOM GFI RECEPTS

WATER FOUNTAIN

E
E

GFI

NEW HEAT PUMP

E
E

EXHAUST FAN

CONTROLLER #3

E

REF. UNIT

E

REF. UNIT

E

MEN DYSON DRYER

0 kVA

0A

Description

COMPUTER GFI RECEPTS

OUTSIDE GFI RECEPTS

FN/Note Poles Trip (A)
E
E

0 kVA

0A

Factor

NOT USED.

2.

SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITHOUT

PRIOR APPROVAL OF THE DESIGN TEAM.

3.

INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITES SIDES OF THE

SAME WALL ARE WITHIN 6" OF EACH OTHER.

4.

COORDINATE ALL DEVICES WITH ARCHITECTURAL PLANS AND CASEWORK.

5.

ALL LIGHTING FIXTURES SHALL BE INSTALLED IN SUCH A WAY THAT DRIVERS ARE

ACCESSIBLE WITHOUT CUTTING OF CEILING. THE DESIGN TEAM SHALL BE

NOTIFIED IMMEDIATELY OF AREAS WHERE THIS IS NOT POSSIBLE.

6.

ALL WALL-MOUNTED FIXTURES SHALL HAVE THEIR EXACT ROUGH-IN LOCATION

DETERMINED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

7.

UNLESS NOTED OTHERWISE BY DESIGNATED LIGHTING CONTROL ZONES, SWITCHES SHOWN SHALL CONTROL ALL FIXTURES IN THE ROOM.

8.

REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR

THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE

ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE

REVIEWED AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

A

1.

Ckt
A-2
A-4
A-6
A-8
A-10
A-12
A-14
A-16
A-18
A-20
A-22
A-24
A-26
A-28
A-30
A-32
A-34
A-36
A-38
A-40
A-42

ELECTRICAL PLAN KEYED NOTES

0 kVA

0A
Demand

E1

NO ELECTRICAL SCOPE IN THIS AREA.

E2

REINSTALL EXISTING LIGHT SWITCH AFTER ARCHITECTURAL WORK HAS