A PDF document (1.1 MB) attached to Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 12, 2026, 10:00 AM (UTC-7).

File name: 2101-AD201_ADD1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

DEMOLITION ELEV SYMBOLS

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

KEY NOTE

AREA OF

STUCCO

REMOVAL

A

A
DE5

DE5

DE5

DE5

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

DE1

DE1

AREA OF TOTAL STUCCO REMOVAL AND REPLACEMENT

DE1

DE14

DE1

DE14

DE2

DE7
DE2
DE15
DE2

DE2

B

TYP

DE11 TYP

DE13

DE10

DE2

DE6

DE2

DEMO EXISTING GUTTER AND DOWNSPOUT SYSTEM IN ITS ENTIRETY

DE3

NOT USED

DE4

REMOVE AND SALVAGE EXISTING SPLASH BLOCK DURING DEMOLITION, TYP

DE5

REMOVE ALL EXISTING STUCCO FINISH AND METAL FLASHING ON CHIMNEY IN

PREPARATION FOR NEW

DE6

REMOVE AND SALVAGE ALL EXISTING HANDRAILS AT STAIR AND RAMP FOR

REFINISHING AND REINSTALLATION AFTER STUCCO WORK IS COMPLETE. SEE

FLOOR PLAN FOR REFINISHING OF THESE ELEMENTS.

DE7

REMOVE AND SALVAGE AWNING, BRACKETS, FASTENERS AND POSTS AND

SALVAGE FOR REINSTALLATION AFTER STUCCO WORK IS COMPLETE. ANY

COMPONENTS OF THE AWNING ASSEMBLY DAMAGED DURING CONSTRUCTION,

INCLUDING FABRIC, BRACKETS, FASTENERS OR POSTS, ARE TO BE REPLACED

IN-KIND OR BETTER THAN THE EXISTING.

DE8

EXISTING PRECAST CONCRETE CAP TO REMAIN

DE9

REMOVE ALL STUCCO FROM WALL AND ENTRANCE CANOPY IN IT'S ENTIRETY SEE DEMOLITION PLAN

FIRST LEVEL

100'-0"

DE2

EXTERIOR DEMOLITION ELEVATION - NORTH

1/4" = 1'-0"

2'

4'

DE4

TYP

EXTERIOR DEMOLITION ELEVATION - EAST

8'

REMOVE ALL EXISTING CLAY TILE ROOFING ASSEMBLY, ASSOCIATED

UNDERLAYMENT, ROOF FLASHINGS, EAVE CLOSERS AND TREATED WOOD

BLOCKING, EXCEPT WHERE NOTED OTHERWISE. EXISTING WOOD SHEATHING

TO REMAIN, SALVAGE A PORTION OF THE REMOVED TILES FOLLOWING THE

DIRECTION PROVIDED IN THE DEMOLITION GENERAL NOTES

DE1

DE9

DEMOLITION ELEVATION KEYED NOTES

DE8

FIRST LEVEL

100'-0"

DE4

T.O. RIDGE CAP

+/- 18'-0" (EXISTING)

TOTAL STUCCO = 2,500 SF

INCLUDING WALLS, SILLS, RAMP AND STAIR

PARTIAL HEIGHT WALLS (ALL SIDES), AND

ENTRANCE CANOPY (ALL SIDES)

1/4" = 1'-0"

2'

4'

8'

C

B

C

DE11

EXISTING CRAWLSPACE VENT TO REMAIN

DE12

NOT USED

DE13

REMOVE AND DISPOSE LIGHT FIXTURE - SEE ELECTRICAL

DE14

EXISTING VENT PIPE TO REMAIN.

DE15

REMOVE AND SALVAGE EXISTING SIGN FOR REINSTALLATION ONCE STUCCO

WORK IS COMPLETE

DE5

DE5

DE10

DE14

DE1

DE10

EXISTING MECH AND ELEC SYSTEMS IN THIS AREA. IF NECESSARY FOR

STUCCO REPLACEMENT, REMOVE AND SALVAGE FOR REINSTALLATION AFTER

STUCCO WORK IS COMPLETE. PROVIDE AND COORDINATE ALL DISCONNECTS

WITH THE VA - SEE ELECTRICAL

DE14
DE1
DE5

DE2
DE5

DE14

DE14
DE14
DE1

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH ELEVATION

DE7 FOREGROUND

DE2

DE2

D

+/- 21'-6"(EXISTING)

D
DE7

DE2
DE8
10/13/2026 1:07:12 PM

DE15 BEYOND

DE2