ELECTRICAL GENERAL NOTES
LIGHTING CONTROL - SEQUENCE OF OPERATION
TAG
ACTIVATION
A
DECRIPTION
MANUAL ON/OFF
1.
NOT USED.
2.
SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITHOUT
PRIOR APPROVAL OF THE DESIGN TEAM.
SCHEDULE
MANUAL LINE VOLTAGE TOGGLE SWITCH
N/A
3.
A
INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITES SIDES OF THE
SAME WALL ARE WITHIN 6" OF EACH OTHER.
4.
COORDINATE ALL DEVICES WITH ARCHITECTURAL PLANS AND CASEWORK.
5.
ALL LIGHTING FIXTURES SHALL BE INSTALLED IN SUCH A WAY THAT DRIVERS ARE
ACCESSIBLE WITHOUT CUTTING OF CEILING. THE DESIGN TEAM SHALL BE
NOTIFIED IMMEDIATELY OF AREAS WHERE THIS IS NOT POSSIBLE.
6.
ALL WALL-MOUNTED FIXTURES SHALL HAVE THEIR EXACT ROUGH-IN LOCATION
DETERMINED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.
7.
UNLESS NOTED OTHERWISE BY DESIGNATED LIGHTING CONTROL ZONES, SWITCHES SHOWN SHALL CONTROL ALL FIXTURES IN THE ROOM.
8.
REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR
THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE
ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE
REVIEWED AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.
9.
ALL DEVICES, EQUIPMENT, FIXTURES, AND THE LIKE MUST BE GROUNDED BY USE
OF A PROPERLY SIZED GROUNDING CONDUCTOR. MECHANICAL AND
ELECTRICAL BONDS OF THE METALLIC RACEWAY SYSTEM SHALL BE MAINTAINED. GROUND AND BOND PER NEC ARTICLE 250.
A
10. ALL DISCONNECTS ON MECHANICAL EQUIPMENT SHALL BE MOUNTED ON
STRUCTURE TO ALLOW REMOVAL OF THE EQUIPMENT FOR MAINTENANCE WITH
A MINIMUM OF WIRING WORK. VERIFY NEC CLEARANCE REQUIREMENTS ARE MET
PRIOR TO ROUGH-IN.
B
B
CU-1
PANEL B-85,87
EX
EX
A
E3
L5-30R RECEPT
120V-1P/30A
E4
PANEL B-91
PANEL B-95
J
FA
EX
EX
EX
EXISTING PESTICIDE
STORAGE
EX
EX
TE
ELECTRICAL PLAN KEYED NOTES
EXISTING PARTS & TOOLS
EX
EXISTING FLAMABLE
STORAGE
EX
EXISTING FLAMABLE
STORAGE
C
14. INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITE SIDES OF THE
SAME WALL ARE WITHIN 24" OF EACH OTHER.
E7
EXISTING PESTICIDE
STORAGE
EXISTING PARTS & TOOLS
EX
E2
12"
EX
12. SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITH PRIOR
APPROVAL FROM THE DESIGN TEAM.
13. ALL RECEPTACLE CIRCUITS SHALL HAVE DEDICATED NEUTRAL.
48"
12"
EX
AS-SCP-1
E9 PANEL B-89
TE
L5-30R RECEPT
120V-1P/30A
PANEL B-93
J
L5-30R L5-30R
WP
EX
11. MAINTAIN SERVICE CLEARANCE AROUND MECHANICAL & ELECTRICAL
EQUIPMENT. DO NOT ROUTE PIPING OR CONDUIT IN CLEARANCE SPACE.
EX
E7
EX
EX
GFI
EX
E7
MAINTENANCE YARD
MAINTENANCE YARD
EX
E2
PROVIDE (2) L5-30R RECEPTACLES FOR TELECOM USE. REFER TO
TECHNOLOGY DRAWINGS FOR ADDITIONAL DETAILS. COORDINATE WITH
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Fort Bliss Gravesite Expansion BD Part 1
- Fort Bliss Gravesite Expansion BD Part 10
- Fort Bliss Gravesite Expansion BD Part 11
- Fort Bliss Gravesite Expansion BD Part 2
- Fort Bliss Gravesite Expansion BD Part 3
- Fort Bliss Gravesite Expansion BD Part 4
- Fort Bliss Gravesite Expansion BD Part 5
- Fort Bliss Gravesite Expansion BD Part 6
- Fort Bliss Gravesite Expansion BD Part 7
- Fort Bliss Gravesite Expansion BD Part 8
- Fort Bliss Gravesite Expansion BD Part 9
- Fort Bliss Gravesite Expansion - Specifications Full Book