Home / Fort Bliss National Cemetery, Gravesite Expansion and FCA… / Document

ADD1

Updated

A PDF document (339 KB) attached to Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 12, 2026, 10:00 AM (UTC-7).

File name: 2101-EL111_ADD1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

LIGHTING FIXTURE SCHEDULE

TYPE

BOD

MANUFACTURER

FA

LIGHTING GENERAL NOTES

MODEL NUMBER

LITHONIA

DESCRIPTION

LAMP/CCT/CRI

3' LED Linear w/ Standard efficiency. Flat diffuse lens. Wide distribution. White finish. Provide accessories required for suspended installation. Coordinate final suspension height and location with all trades. BAA and BABA Compliant.

CLX-L36-3750LM-SEF-FDL-WD-MVOLT-GZ10-35K-80CRI-WH

LED/3500K/80

CONTROL

0-10V 10%

DELIVERED

LUMENS

WATTS

3750

26.5

VOLTS

MVOLT

1.

NOT USED.

2.

SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITHOUT

PRIOR APPROVAL OF THE DESIGN TEAM.

3.

INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITES SIDES OF THE

SAME WALL ARE WITHIN 6" OF EACH OTHER.

4.

COORDINATE ALL DEVICES WITH ARCHITECTURAL PLANS AND CASEWORK.

5.

ALL LIGHTING FIXTURES SHALL BE INSTALLED IN SUCH A WAY THAT DRIVERS ARE

ACCESSIBLE WITHOUT CUTTING OF CEILING. THE DESIGN TEAM SHALL BE

NOTIFIED IMMEDIATELY OF AREAS WHERE THIS IS NOT POSSIBLE.

6.

ALL WALL-MOUNTED FIXTURES SHALL HAVE THEIR EXACT ROUGH-IN LOCATION

DETERMINED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

7.

UNLESS NOTED OTHERWISE BY DESIGNATED LIGHTING CONTROL ZONES, SWITCHES SHOWN SHALL CONTROL ALL FIXTURES IN THE ROOM.

8.

REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR

THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE

ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE

REVIEWED AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

A

A
WA

MCGRAW-EDISON

Wall Mount LED. Medium Size, Output Level 1, Type IV Distribution, IP66 RATED Button Photocontrol. BAA And BABA Compliant.

BABA-GKO-PB2A-840-120-T4W-BK-BPC

L G

I H T N

I

TAG

G O
C N

T

R O L - S

E Q U N

E

E
C O

F
O

LED/4000K/80

0-10V

3750

120V

E
P A
R T
I O N

ACTIVATION

DECRIPTION

SCHEDULE

A

MANUAL ON/OFF

MANUAL LINE VOLTAGE TOGGLE SWITCH

N/A

B

AUTO ON/OFF via PHOTOCELL

AUTO ON/OFF via EXTERIOR PHOTOCELL INTEGRAL TO LIGHT FIXTURES.

N/A

LIGHTING PLAN KEYED NOTES

L1

NO LIGHTING SCOPE IN THIS AREA.

L2

PROVIDE NEW LIGHTING FIXTURE TO REPLACE EXISTING AFTER

ARCHITECTURAL WORK HAS BEEN COMPLETED. RECONNECT NEW

FIXTURE TO EXISTING LIGHTING CIRCUIT.

L3

EXTEND NEAREST EXISTING LIGHTING CIRCUIT TO NEW FIXTURE.

L4

CLEAN AND REINSTALL EXISTING TROFFER IN NEW LOCATION AFTER

ARCHITECTURAL WORK HAS BEEN COMPLETED. REFER TO DEMOLITION

PLAN FOR ADDITIONAL DETAILS. RECONNECT EXISTING CIRCUIT AND

CONTROLS.

B

B

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

B
L2

WA

C

C

EXISTING ADMIN OFFICER

EXISTING UNISEX TOILET

EX

EX
EX

EX

EX

EXISTING PROGRAM

SPECIALIST

EX

EX

EXISTING ADMIN STAFF

EX

EX

The beginning of the document. Download the full file to read on.

Other documents in this bid