Home / Tinker AFB 2026 Multiple Award Construction Contract (MACC) / Document

Appendix C UMRL

Updated

A PDF document (686 KB) attached to Tinker AFB 2026 Multiple Award Construction Contract (MACC), from the Department of the Air Force. Due Oct 28, 2026, 1:00 PM (UTC-5).

File name: Appendix C UMRL.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

U.S. Army Corps of Engineers
U.S. Navy Naval Facilities Engineering Systems Command
U.S. Air Force Civil Engineer Center

Unified
Master Reference List

(UMRL)

January 2024

UNIFIED MASTER REFERENCE LIST (UMRL)

This document lists publications referenced in the Unified Facilities Guide Specifications (UFGS) of the Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), and the Air Force Civil Engineer Center (AFCEC). The listing is current to the date of this publication.
The UMRL lists issuing organizations alphabetically by name and not by acronym. In some cases more than one organization may use the same acronym. If a listed reference does not have a designator assigned by the issuing organization, a designator for the document has been established for use within SpecsIntact.
Where a reference has a joint designation (example: ANSI/BHMA), the UMRL usually lists the reference under the proponent organization (example: The proponent of ANSI/BHMA A156.1 is BHMA; therefore the reference in the UMRL is under BHMA). This procedure simplifies referencing and ordering of joint documents, and specification sections should cite such reference publications using the same designations used in the UMRL. Acronyms of major proponent organizations listed in the UMRL which have joint publications with other standards organization are as follows:

Proponent
Organization

Joint With

ASME

ASTM

BHMA

EIA

IEEE

NEMA

NFPA

ANSI

AASHTO

ANSI

ANSI

ANSI

ANSI

ANSI

Guide Specification section UFGS-01 42 00 SOURCES FOR REFERENCE PUBLICATIONS includes all organizations listed in the UMRL. The section is automatically edited to fit the project when the project specifications are produced through SpecsIntact. The UMRL is maintained up-to-date on a continuing basis and is published periodically in electronic format (PDF for use with free Adobe Reader software).

AACE INTERNATIONAL (AACE)

AACE 29R-03

(2011) Forensic Schedule Analysis

AACE 52R-06

(2006) Time Impact Analysis - As Applied in
Construction

AACE 84R-13

(2015) Planning and Accounting for Adverse Weather

ACOUSTICAL SOCIETY OF AMERICA (ASA)

ASA S1.4

(1983; Amendment 1985; R 2006) Specification for
Sound Level Meters (ASA 47)

ASA S1.11 PART 1

(2014) American National Standard Electroacoustics
– Octave-Band and Fractional-Octave-Band Filters –
Part 1: Specifications

ASA S1.13

(2005; R 2010) Methods for the Measurement of Sound
Pressure Levels in Air (ASA 118)

ASA S3.1

(1999; R 2018) American National Standard Maximum

The beginning of the document. Download the full file to read on.

Other documents in this bid