Appendix C UMRL
Updated
A PDF document (686 KB) attached to Tinker AFB 2026 Multiple Award Construction Contract (MACC), from the Department of the Air Force. Due Oct 28, 2026, 1:00 PM (UTC-5).
File name: Appendix C UMRL.pdf
The full file is for paid members, or buy this bid alone.
Preview
U.S. Army Corps of Engineers
U.S. Navy Naval Facilities Engineering Systems Command
U.S. Air Force Civil Engineer Center
Unified
Master Reference List
(UMRL)
January 2024
UNIFIED MASTER REFERENCE LIST (UMRL)
This document lists publications referenced in the Unified Facilities Guide Specifications (UFGS) of the Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), and the Air Force Civil Engineer Center (AFCEC). The listing is current to the date of this publication.
The UMRL lists issuing organizations alphabetically by name and not by acronym. In some cases more than one organization may use the same acronym. If a listed reference does not have a designator assigned by the issuing organization, a designator for the document has been established for use within SpecsIntact.
Where a reference has a joint designation (example: ANSI/BHMA), the UMRL usually lists the reference under the proponent organization (example: The proponent of ANSI/BHMA A156.1 is BHMA; therefore the reference in the UMRL is under BHMA). This procedure simplifies referencing and ordering of joint documents, and specification sections should cite such reference publications using the same designations used in the UMRL. Acronyms of major proponent organizations listed in the UMRL which have joint publications with other standards organization are as follows:
Proponent
Organization
Joint With
ASME
ASTM
BHMA
EIA
IEEE
NEMA
NFPA
ANSI
AASHTO
ANSI
ANSI
ANSI
ANSI
ANSI
Guide Specification section UFGS-01 42 00 SOURCES FOR REFERENCE PUBLICATIONS includes all organizations listed in the UMRL. The section is automatically edited to fit the project when the project specifications are produced through SpecsIntact. The UMRL is maintained up-to-date on a continuing basis and is published periodically in electronic format (PDF for use with free Adobe Reader software).
AACE INTERNATIONAL (AACE)
AACE 29R-03
(2011) Forensic Schedule Analysis
AACE 52R-06
(2006) Time Impact Analysis - As Applied in
Construction
AACE 84R-13
(2015) Planning and Accounting for Adverse Weather
ACOUSTICAL SOCIETY OF AMERICA (ASA)
ASA S1.4
(1983; Amendment 1985; R 2006) Specification for
Sound Level Meters (ASA 47)
ASA S1.11 PART 1
(2014) American National Standard Electroacoustics
– Octave-Band and Fractional-Octave-Band Filters –
Part 1: Specifications
ASA S1.13
(2005; R 2010) Methods for the Measurement of Sound
Pressure Levels in Air (ASA 118)
ASA S3.1
(1999; R 2018) American National Standard Maximum
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Contract Data Requirements List - TO Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix B1 TAFB General Requirements Div 00-01
- Attachment 1: Statement of Work Jun26
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- Attachment 3: Section M Evaluation Criteria
- TAFB Technical Requirements Div 02-48
- ERDCITL r2
- ERDCITL r6
- TAFB SOP outages v2