Attachment 3: Section M Evaluation Criteria
Updated
A PDF document (208 KB) attached to Tinker AFB 2026 Multiple Award Construction Contract (MACC), from the Department of the Air Force. Due Oct 28, 2026, 1:00 PM (UTC-5).
File name: Attachment_3_Section_M_Evaluation_Criteria 29 July 26.pdf
The full file is for paid members, or buy this bid alone.
Preview
SECTION M
EVALUATION CRITERIA
FOR
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
REQUEST FOR PROPOSAL FA8137-26-R-0040
Air Force Sustainment Center
29 July 2026
FA813726R0040
Section M
Evaluation Criteria
1.0 GENERAL INFORMATION
1.1 Basis of Contract Award. This is a Highest Technically Rated Offeror (HTRO) source selection conducted in accordance with the DoD Source Selection Procedures and the Revolutionary FAR Overhaul (RFO) 15.2 as supplemented. The best value basis for award will be determined by utilizing the Highest Technically Rated Offerors (HTRO) Minimum Technical Threshold Rating (MTTR) approach. Award will be made to those Offerors whose proposals demonstrate Technical Experience within the Government-validated Minimum Technical Threshold Rating (MTTR), whose proposals conform to the solicitation’s requirements, and who have been determined to be responsible in accordance with RFO Part 9.
The Source Selection Authority (SSA) will base the source selection decision on the evaluation criteria as described later in this section. While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective; therefore, professional judgement is implicit throughout the entire process.
1.2 Number of Contracts to be Awarded. Contracts for the Small Business Pool will be awarded
to small businesses that meet or exceed the HTRO MTTR, whose proposals conform to the solicitation’s requirements and who have been determined to be responsible in accordance with RFO Part 9. Contracts for the Full and Open Pool will be awarded to all offerors, whether large or small business, who submitted a proposal for the Full and Open Pool and meet or exceed the HTRO MTTR and whose proposal conforms to the solicitation’s requirements and who have been determined to be responsible in accordance with RFO Part 9.
1.3 Period of Performance. The contracts will consist of a base 5-year ordering period and one 5-year optional ordering period.
1.4 Indefinite Delivery Indefinite Quantity (IDIQ) Ceiling. The ceiling of the IDIQ is $950M. The total value of all task orders (TOs) awarded under the IDIQ will not exceed this amount. 1.5 Minimum Guaranteed Task Order. The minimum guaranteed order is $500.00. This amount
represents the effort involved with an in-person post award conference. This is not a requirements contract and any Contractor that is awarded a MACC IDIQ contract is not guaranteed any task order
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Contract Data Requirements List - TO Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix B1 TAFB General Requirements Div 00-01
- Appendix C UMRL
- Attachment 1: Statement of Work Jun26
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- TAFB Technical Requirements Div 02-48
- ERDCITL r2
- ERDCITL r6
- TAFB SOP outages v2