Attachment 1: Statement of Work Jun26
Updated
A PDF document (1.0 MB) attached to Tinker AFB 2026 Multiple Award Construction Contract (MACC), from the Department of the Air Force. Due Oct 28, 2026, 1:00 PM (UTC-5).
File name: Attachment 1 - Statement of Work Jun26.pdf
The full file is for paid members, or buy this bid alone.
Preview
CUI
Statement of Work
Multiple Award Construction Contract for
General Construction Services
Revision: 3
Tinker Air Force Base, Oklahoma
June 2026
Prepared By:
72 ABW Civil Engineering Directorate
7535 5th Street, Building 400
Tinker AFB, OK 73145
-i-
CUI
CUI
1.
1.1
1.2
1.3
2.
2.1
2.2
2.3
3.1
3.2
3.3
4.1
4.2
4.3
5.1
5.2
7.1
7.2
10.1
10.2
10.3
10.4
10.5
11.1
- ii -
CUI
CUI
11.2
11.3
11.4
11.5
11.6
11.7
11.8
11.11
11.12
11.13
11.14
11.15
11.16
11.17
11.18
11.19
- iii -
CUI
CUI
13.1
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Contract Data Requirements List - TO Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix B1 TAFB General Requirements Div 00-01
- Appendix C UMRL
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- Attachment 3: Section M Evaluation Criteria
- TAFB Technical Requirements Div 02-48
- ERDCITL r2
- ERDCITL r6
- TAFB SOP outages v2