TAFB Technical Requirements Div 02-48
Updated
A PDF document (9.8 MB) attached to Tinker AFB 2026 Multiple Award Construction Contract (MACC), from the Department of the Air Force. Due Oct 28, 2026, 1:00 PM (UTC-5).
File name: B2 -TAFB Technical Requirements Div 02-48.pdf
The full file is for paid members, or buy this bid alone.
Preview
Tinker AFB, OK
TAFB Technical Sprcifications 2019
SECTION 02 41 00
DEMOLITION AND DECONSTRUCTION
PART 1
1.1
GENERAL
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI Guideline K
(2009) Guideline for Containers for
Recovered Non-Flammable Fluorocarbon
Refrigerants
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 145
(1991; R 2012) Standard Specification for
Classification of Soils and Soil-Aggregate
Mixtures for Highway Construction Purposes
AASHTO T 180
(2015) Standard Method of Test for
Moisture-Density Relations of Soils Using
a 4.54-kg (10-lb) Rammer and a 457-mm
(18-in.) Drop
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6
(2006) Safety Requirements for Demolition
Operations
CARPET AND RUG INSTITUTE (CRI)
CRI CIS
(2011) Carpet Installation Standard
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1
(2014) Safety and Health Requirements
Manual
U.S. DEFENSE LOGISTICS AGENCY (DLA)
DLA 4145.25
(Jun 2000; Reaffirmed Oct 2010) Storage
and Handling of Liquefied and Gaseous
Compressed Gases and Their Full and Empty
Cylinders
http://www.aviation.dla.mil/UserWeb/aviationengineering/
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 4000.25-1-M
April 2019
(2006) MILSTRIP - Military Standard
Requisitioning and Issue Procedures
SECTION 02 41 00
Tinker AFB, OK
MIL-STD-129
TAFB Technical Sprcifications 2019
(2014; Rev R) Military Marking for
Shipment and Storage
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 70/7460-1
(2015; Rev L) Obstruction Marking and
Lighting
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61
National Emission Standards for Hazardous
Air Pollutants
40 CFR 82
Protection of Stratospheric Ozone
49 CFR 173.301
Shipment of Compressed Gases in Cylinders
and Spherical Pressure Vessels
1.2
1.2.1
PROJECT DESCRIPTION
Demolition/Deconstruction Plan
Prepare a Demolition Plan and Deconstruction Plan and submit proposed salvage, demolition, deconstruction, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Coordinate
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Contract Data Requirements List - TO Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix B1 TAFB General Requirements Div 00-01
- Appendix C UMRL
- Attachment 1: Statement of Work Jun26
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- Attachment 3: Section M Evaluation Criteria
- ERDCITL r2
- ERDCITL r6
- TAFB SOP outages v2