Appendix B1 TAFB General Requirements Div 00-01
Updated
A PDF document (9.8 MB) attached to Tinker AFB 2026 Multiple Award Construction Contract (MACC), from the Department of the Air Force. Due Oct 28, 2026, 1:00 PM (UTC-5).
File name: Appendix B1 TAFB General Requirements Div 00-01.pdf
The full file is for paid members, or buy this bid alone.
Preview
Tinker AFB
Tinker General Requirements
00 70 00
GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE
PART 1
1.1
GENERAL
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. The most current edition of the listed publications at the time of contract/delivery order award shall be used.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241
(2022) Standard for Safeguarding
Construction, Alteration, and Demolition
Operations
NFPA 51B
(2019; TIA 20-1) Standard for Fire
Prevention During Welding, Cutting, and
Other Hot Work
NFPA 55
(2016; TIA 16-1; TIA 16-2) Compressed
Gases and Cryogenic Fluids Codes
NFPA 70
(2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
NFPA 72
(2019; TIA 19-1; ERTA 1 2019; TIA 21-1;
ERTA 1 2021) National Fire Alarm and
Signaling Code
TINKER AIR FORCE BASE (TAFB)
TAFBI 13-204
(2021) Airfield Operations
TAFB Plan 31-101
Integrated Defense Plan
TAFB Outage SOP
(2022) Planned and Emergency Outages
Standard Operating Procedures
U.S. AIR FORCE (USAF)
DoDI O-2000.16v1_AFI 10-245-O
(2020) Antiterrorism (AT) Program
Implementation
AFI 48-104
(2019) Tobacco Free Living
AFMAN 91-203
(2018; with Guidance Memorandum, 2021) Air
Force Occupational Safety, Fire, and
Health Standards
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-260-01
January 2022
(2019; with Change 1, 2020) Airfield and
Section 00 70 00
Tinker AFB
Tinker General Requirements
Heliport Planning and Design
UFC 3-600-01
(2016; with Change 6, 2021) Fire
Protection Engineering for Facilities
UFC 3-601-02
(2021) Fire Protection Systems Inspection,
Testing, and Maintenance
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910-SUBPART Q
Welding, Cutting, and Brazing
29 CFR 1926
Safety and Health Regulations for
Construction
1.2
SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Entry Access List; G
Key Issue Receipt
SD-06 Test Reports
Fire Alarm Pre-Construction Testing Record; G
SD-07 Certificates
Welding, Cutting and Brazing Permit; G
Framed Instructions
SD-11 Closeout Submittals
Key Return Receipt
1.3
1.3.1
WORK REQUIREMENTS
Security/Contractor Identification Badges
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Contract Data Requirements List - TO Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix C UMRL
- Attachment 1: Statement of Work Jun26
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- Attachment 3: Section M Evaluation Criteria
- TAFB Technical Requirements Div 02-48
- ERDCITL r2
- ERDCITL r6
- TAFB SOP outages v2