CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
C. CATEGORY:
B. EXHIBIT
TDP
D. SYSTEM/ITEM
1. DATA ITEM NO.
E. CONTRACT/PR NO.
F. CONTRACTOR
2. TITLE OF DATA ITEM
OTHER
TM
3. SUBTITLE
17. PRICE GROUP
Task Ordere Progress Meeting
5. CONTRACT REFERENCE
4. AUTHORITY (Data Acquisition Document No.)
Not Applicable
7. DD 250 REQ
No
8. APP CODE
6. REQUIRING OFFICE
MACC SOW, Paragraph 11.11.7
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
N/A
11. AS OF DATE
N/A
18. ESTIMATED
TOTAL PRICE
72 ABW/CEN & AFSC/PZIOC
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 16
Block 16
b. COPIES
Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Final
Draft
Reg
Block 16
AFSC/PZIOC
The Contractor, at the direction of the CO, shall schedule to discuss individual TOs that are high visibility, 72 ABW/CEN behind schedule, or outstanding issues (CDRL 003).
16. REMARKS
Repro
Provide Meeting Agenda and Presentation materials within 1calendar day of the scheduled meeting. Provide Meeting Minutes within 1 calendar day of the progress meeting. Meeting shall address, at a minimum, the following:
- Current vs Planned percentage complete
- Contractual vs. Projected completion date
- (Design Build only) Most recent design milestone and projected date for next - (Design Build only) Scheduled design completion date vs. projected - List of outstanding RFIs
- List of outstanding submittals
- Three-week look ahead
- Any personnel or subcontractor changes since last meeting - Any issues which may affect completion date
add continuation
G. PREPARED BY
Richard Stewart
DD FORM 1423, FEB 2024
Show Attachment Bar
H. SIGNED ON 20260709
Digitally signed by
STEWART.RICHARD.ALLEN.12698
41741
Date: 2026.07.09 08:23:08 -05'00'
15.TOTAL
I. APPROVED BY
J. SIGNATURE
Ray Green
signed by
GREEN.TIMOTHY Digitally
GREEN.TIMOTHY.RAY.1146518911
.RAY.1146518911 Date: 2026.07.09 08:56:42 -05'00'
UNCLASSIFIED
PREVIOUS EDITION MAY BE USED.
+
-
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award).
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix B1 TAFB General Requirements Div 00-01
- Appendix C UMRL
- Attachment 1: Statement of Work Jun26
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- Attachment 3: Section M Evaluation Criteria
- TAFB Technical Requirements Div 02-48
- ERDCITL r2
- ERDCITL r6
- TAFB SOP outages v2