TAFB SOP outages v2
Updated
A PDF document (473 KB) attached to Tinker AFB 2026 Multiple Award Construction Contract (MACC), from the Department of the Air Force. Due Oct 28, 2026, 1:00 PM (UTC-5).
File name: TAFB_SOP_outages_v2.pdf
The full file is for paid members, or buy this bid alone.
Preview
PLANNED & EMERGENCY
OUTAGES
STANDARD OPERATING
PROCEDURES
TINKER AIR FORCE BASE
72 ABW / Base Civil Engineering
Planned and Emergency Outages
Standard Operating Procedures
EFFECTIVE DATE: 03 January 2022
APPLICABILITY:
These Standard Operating Procedures (SOP) apply to any entity that needs or wishes to request any type of outage/closure on Tinker Air Force Base (TAFB), including but not limited to: Gates, Roads, Parking (lots or spaces), Sidewalks, Fire Alarms, Fire Suppression Systems, HVAC, Compressed Air, and all Utilities (gas, electric, water, steam, etc).
PURPOSE:
The purpose of this SOP is to define the roles, responsibilities, and processes in requesting, coordinating, scheduling, and executing outages as well as the restoration procedures for outages related to emergencies, daily operations, and construction projects.
STRATEGIC VISION:
Safeguard resources by proactively managing all outages and closures to minimize operational impacts.
ATTACHMENTS:
1. Attachment 1 shows the process that all outage and closure requests will follow. 2. Attachment 2 is the form that shall be used when requesting an outage on TAFB. 3. Attachment 3 is the list of Points of Contact for the TAFB 72 ABW CE Utilities Shops.
DEFINITIONS:
1.
REQUESTOR: The person who initiates the outage request and is responsible for overall stewardship and accountability for an Outage or closure.
2.
TAFB CONTRACT POINT OF CONTACT (PRIMARY CONTACT): The person who is
responsible for oversight of the Outage or Closure and is the REQUESTOR’S primary point of contact within Base Civil Engineering (BCE) on TAFB. This could be someone from the US Army Corps of Engineers or the Contractor or Government individual tasked with liaison duties for the BCE.
3.
STAKEHOLDER: Individuals and/or groups who are involved in and/or impacted by an Outage and whose concurrence is required to perform the Outage. Examples include, but are not limited to: building occupants, Facility Managers, Fire Marshal (AHJ), 72 ABW CE Shops, TAFB IT/Communications, USAF Security Forces, Workers Union, etc.
4.
UTILITY: Any service provided by an outside source, or manufactured in house (including but not limited to: propane or natural gas, water, electricity, fire suppression (water or foam), chilled water, steam, vacuum, compressed air, etc.), which facilitates building operations.
72 ABW / Base Civil Engineering
Planned and Emergency Outages
Standard Operating Procedures
5.
OUTAGE WORK REQUEST FORM (ATTACHMENT 2): A document that provides full
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Contract Data Requirements List - TO Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix B1 TAFB General Requirements Div 00-01
- Appendix C UMRL
- Attachment 1: Statement of Work Jun26
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- Attachment 3: Section M Evaluation Criteria
- TAFB Technical Requirements Div 02-48
- ERDCITL r2
- ERDCITL r6