Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

Attachment 1: DD1354

Updated

A PDF document (93 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: 017800_Attch1_DD1354.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Form Approved

OMB No. 0704-0188

TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY

PAGE

OF

PAGES

The public reporting burden for this collection of information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, 4800 Mark Center Drive, Alexandria,VA 22350-3100 (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. FROM (Organization Name)

2. DATE PREPARED

3. PROJECT/JOB

(YYYYMMDD)

NUMBER

4. SERIAL NUMBER

8. TRANSACTION DETAILS

a. METHOD (X all that apply)

b. WHEN/EVENT (X one)

ACQUISITION BY CONSTRUCTION

6. RPSUID/SITENAME/

5. TO (Organization - Installation Code and Name)

INSTCODE/INSTNAME

7. CONTRACT

NUMBER(S)

TRANSFER BETWEEN SERVICES

7a. PLACED-INSERVICE DATE

CAPITAL IMPROVEMENT

(YYYYMMDD)

TOTAL ASSET

PLACED-IN-SERVICE

PARTIAL ASSET

PLACED-IN-SERVICE

INVENTORY ADJUSTMENT

c. TYPE (X one)

DRAFT

9.

ITEM

NO.

10a.

FACILITY

NO.

10b.

RPUID

11.

CATEGORY

CODE

12.

CATCODE

DESCRIPTION

13.

14.

OTHER

AREA

15.
TYPE SUST.

CODE CODE PRIMARY

UM

16.

PRIMARY UM

QUANTITY

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side. a. TRANSFERRED BY (Typed Name and Signature)

17.

18.

SECONDARY SECONDARY UM

UM

QUANTITY

FINAL

20.

21.

FUND

SOURCE

FUND

ORG

INTERIM

22.

INTEREST

CODE

23.

ITEM

REMARKS

25a. ACCEPTED BY (Typed Name and Signature)

b. DATE SIGNED

(YYYYMMDD)

c. TITLE (DPW/RPAO)

26. PROPERTY

VOUCHER NUMBER

b. DATE SIGNED

(YYYYMMDD)

c. TITLE (Area Engr./Base Engr./DPW/Construction Agent)

DD FORM 1354, AUG 2013

19.

COST

PREVIOUS EDITION MAY BE USED.̀̀

Adobe Designer 9.0

27. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations)

28. PROJECT REMARKS (Attach blank sheet for continuations)

INSTRUCTIONS

GENERAL. This form has been designed and issued for use in connection with the transfer of

The beginning of the document. Download the full file to read on.

Other documents in this bid